BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a road / highway in Marshalltown, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Approximately 40 miles of HMA street crack and joint cleaning, filling of HMA on cracks wider than 1-inch, placing of filler material to seal cracks, and traffic control. ll work shall be substantially complete on or before June 26th, 2026, and shall be completed and ready for final payment on or before August 28th, 2026. A pre-bid conference will not be held for the Project. A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5) percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of the General Conditions or a certified check in an amount equal to five percent (5%) of the total amount of the bid, drawn on and certified payable by a solvent bank to the City Treasurer of the City. Such Bid bond will be issued in the form included in the Bidding Documents. The City Council reserves the right to reject any and all bids and to waive technicalities and irregularities and all bids must remain effective for a period of 30 days of opening same.

Award

Roads / Highways

$400,624.00

Public - City

Paving, Site Work

8

5

19

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
126
Bidding Soon
1,449
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

October 3, 2025

Project location map

Multiple Locations, Marshalltown, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.