Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 5, 2025 at 7:00 PM
Updated December 6, 2025
Site work for a water / sewer project in Alcester, South Dakota. Completed plans call for site work for a water / sewer project.
Est. Value Notes: $950,000 to $1,100,000 Description: Furnish and Install 3,900 to 4,500 feet of 8" sanitary sewer CIPP lining (Various Bid Alts.); Furnish and Install 390 feet of 10" sanitary sewer CIPP lining (Bid Alt. 3); Furnish and Install sanitary sewer CIPP short liner patch (Bid Alt. 2); Furnish and Install 56 lateral liners with cleanouts; Furnish and Install 12 to 19 blind lateral liners (Various Bid Alts.); Rehabilitation of 14 to 16 manholes consisting of approximately 174 vertical feet (Various Bid Alts.); All other miscellaneous work required not herein mentioned but inferred from the construction contract documents. A pre-bid conference will not be held. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner as liquidated damages if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. The Owner reserves the right to reject any or all bids. The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. Davis-Bacon and related acts provisions apply to this project. All provisions relative to those acts must be met. Davis Bacon wage rates must be used. The successful bidder- including any contractors and their subcontractors on the project, must be registered in online he goal for female utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 6.9%. The goal for disadvantaged/minority utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 1.2%. The goals are applicable to the Contractor's aggregate on-site construction workforce whether or not part of that workforce is performing work on a federal and federally assisted contract or subcontract. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. QA date - 12-11-2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Tanya Miller, PE Banner Associates, Inc. 409 22 nd Avenue South Brookings, SD 57006 Toll Free: 855.323.6342 Email: tanyam@bannerassociates.com Questions received less than seven days prior to the date for opening of Bids may not be answered.
GC Bidding
Water / Sewer
$1,100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2025
February 16, 2026
Multiple Locations, Alcester, SD
Related To This Project
Alcester, SD
--
Alcester, SD
Bid Date: Dec 18 2025
Alcester, SD
--
Alcester, SD
Bid Date: Feb 14 2025
Alcester, SD
--
Alcester, SD
Bid Date: Aug 01 2024
Alcester, SD
Bid Date: Oct 01 2025
Alcester, SD
Bid Date: Apr 02 2020
Alcester, SD
Bid Date: Mar 23 2022
Alcester, SD
--
Alcester, SD
Bid Date: Dec 08 2022
Alcester, SD
Bid Date: Mar 09 2023
Carthage, SD
Bid Date: Sep 03 2025
Volga, SD
Bid Date: Sep 05 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
