BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated November 11, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Oakwood, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Staged removaland replacement of dual structures (SN's 092-001 and 092-002) on I-74 at Stony Creek. The scope of work for this project shall consist of the staged removal of existing dual structures consisting of three simple span PPC-I beam and reinforced concrete deck superstructure, and the construction in stages of dual structures consisting of three spans W33 composite steel beams, a 15_ skew, two solid wall piers on piles and pile supported integral abutments. The scope also includes pavement and shoulder removal, shoulder resurfacing and reconstruction, and pavement connector (PCC) construction and all incidental and related collateral work necessary to complete the project as shown on the plans and as described herein for the following bridge structures: Eastbound Interstate 74 at Stony Creek (Existing Structure No. 092-0001, Proposed Structure No. 092-0210) and Westbound Interstate 74 at Stony Creek (Existing Structure No. 0920002, Proposed Structure No. 092-0211). C-95-063-98 Section: (92-9BR)I-1 Region 3 District 5 Federal Project # BRZDC3(106) County(s) Vermilion Key Route(s)FAI 74 Marked Route(s) I-74 Section(s) (92-9)BR State Job #(s) C-95-026-19 PPS #(s) 5-53278-0000 DBE% 0.00 VBP% 0.00 Contract Specifics Completion Date: 150 Working Days Questions not accepted as of September 09, 2025 04:30 PM Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, August 29, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 043 - Staged Removaland Replacement of Dual Structures (SN's 092-001 and 092-002) on I-74 at Stony Creek

Award

Bridges / Tunnels

$7,049,795.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

6

13

3

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
77
Bidding Soon
933
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2025

November 18, 2025

Project location map

I-74, Oakwood, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.