BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2025 at 8:00 PM

Updated October 9, 2025

Demolition and site work for a municipal facility in Caseyville, Illinois. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Contractor shall provide all materials, tools, machinery, labor and supervision necessary for the demolition work on the above properties. Demolition work shall include excavation with proper erosion and dust control of all footings and foundations and removal of all debris from the demolition site. Contractor shall be responsible for obtaining the local demolition approved permits. Prior to starting demolition, the village of Caseyville will plan for utility to be disconnected, but it will be the responsibility of the contractor to contact all utility providers (water, sewer, electric gas and cable) prior to commencement of demolition activities to ensure that disconnection has been made. No materials shall be salvaged, stored or accumulated in any area. The contractor shall be responsible for the removal and proper disposal of all materials and shall provide Village of Caseyville with landfill receipts prior to release of payment. Debris is to be delivered to a landfill(s) licensed for this type of debris in accordance with all federal, state and local laws. All loads shall be covered and secured prior to and during transport. Asbestos testing required. The contractor relieves Village of Caseyville of all liability in the disposal of debris. The contractor is responsible for all other applicable fees, permits and required notices not identified above. The contractor shall provide a safe working environment. The contractor must backfill excavation site with clean fill material, seed and straw within seven (7) days of demolition. Bid shall be good for a period of 90 days after awarded. Award will be made to the lowest responsive and responsible bidder. The Village of Caseyville reserves the right to reject any or all bids, to waive any informality or technicality in the bidding and to determine which is the lowest, responsive and most responsible bid. Any questions containing to the bid or equipment, please email jalvarez@caseyville.org

Post-Bid

Municipal

$100,000.00

Public - City

Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
94
Bidding Soon
1,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

31 Hadfield Ln, Caseyville, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.