Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 20, 2026 at 8:00 PM
Updated May 21, 2026
Site work, paving and new construction of a mixed-use development in Burlington, Iowa. Completed plans call for the construction of a 12,400-square-foot fire / police facility; and for site work for a fire / police facility.
*Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. The project includes a freestanding fire station with an attached apparatus bay. The living quarters consist of approximately 6,900 square feet and includes a training room, a office, day room, exercise room, five dorm rooms, decontamination room, medical storage, lockers rooms, restrooms, and showers. The apparatus bay consists of approximately 4,000 square feet and has three drive-through bays and additional storage/workspace on both ends. The total building consists of approximately 10,900 square feet. Scope also includes sidewalks, stoops, and additional paving wrapping around the building. In addition to the main building, there is also a detached 1,500 square feet storage garage. Bid Package # Description 1 Sitework and Utilities 2 Site Paving, Sidewalks, and Floors 3 General Construction 4 Roofing & Sheetmetal 5 Fire Sprinkler 6 Plumbing & HVAC 7 Electrical All bids shall be accompanied by bid security in a separate sealed envelope, as allowed by Section 26.14A of the Iowa Code. Bid security in the amount of 5% of the total bid, in the form of a certified check, credit union share draft, or a surety bond written on an original AIA Document A310, Bid Bond, is required for this project. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum for all packages being bid. The surety providing the bonds must have an (A-) A.M. Best rating or better or be listed on the U.S. Department of the Treasury listing of approved sureties (Department Circular 570). The cost of the Bonds shall be included in the Contract Sum. Contractors with their principal place of business outside of Iowa shall be prepared to submit an Out-of-State Contractor Bond to the Iowa Division of Labor in accordance with Chapter 91C of the Code of Iowa.
GC Bidding
Fire / Police
$7,000,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2026
July 27, 2026
2100 N Roosevelt Ave, Burlington, IA
Related To This Project
Burlington, IA
Bid Date: Sep 19 2025
Burlington, IA
Bid Date: Nov 18 2025
Burlington, IA
Bid Date: Nov 14 2025
Burlington, IA
--
Burlington, IA
Bid Date: Jun 02 2026
Burlington, IA
Bid Date: Jun 16 2026
Burlington, IA
--
Burlington, IA
--
Burlington, IA
--
Burlington, IA
Bid Date: Aug 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
