BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 9, 2026 at 7:00 PM

Updated January 10, 2026

Site work and paving for a mixed-use development in Fort Pierce, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.d4fdot.com/tcfdot/state_road_713_kings_highway.asp State Road (SR) 713/Kings Highway from North of I-95 Overpass to North of St. Lucie Boulevard Financial Number: 438379-1-52-01 & 438379-2-52-01 Project Length: 2.610 miles (FPID: 438379-1-52-01: 1.400 miles, FPID: 438379-2-52-01: 1.210 miles) Project Limits: SR 713/Kings Highway from North of I-95 Overpass to North of St. Lucie Boulevard Virtual Public Workshop: The Public Information Workshop is scheduled for Thursday, February 10, 2022, at 6: 00 pm. The public meeting will be offered in two different formats: virtual and in-person. FPID: 438379-1-52-01: 438379-1-52-01: SR 713/Kings Hwy from North of I-95 Overpass to North of Commercial Circle Split into two construction segments FPID: 438379-4-52-01: SR 713/Kings Hwy from North of I-95 Overpass to Angle Rd. FPID: 438379-5-52-01: SR 713/Kings Hwy from Angle Rd. to North of Commercial Circle Projected Letting: July 2026 Start Date: Fall 2026 Completion Date: Fall 2030 Estimated Construction Cost: $61 million FPID: 438379-2-52-01: : SR 713/Kings Hwy from North of Commercial Circle to North of St. Lucie Boulevard Projected Letting: Pending construction funding availability Start Date: Pending construction funding availability Completion Date: Pending construction funding availability Estimated Construction Cost: $43 million Scope of Work: Construction along Kings Highway consists of replacing the existing two lane undivided rural roadway with a newly constructed four-lane suburban divided roadway The proposed roadway will have: A 30-foot wide median (22-foot wide raised plus two 4-foot paved shoulders) Curb and gutters along the inside and outside 7-foot wide outside paved shoulders for use as bike lanes 12-foot wide shared use path adjacent to the road along the west side 6-Foot wide sidewalk along the east Side New lighting System New drainage System New flat slab bridges over the C-25 Canal and Canal No.1 North St. Lucie Water Control District Canal 32E will be shifted to the east Fort Pierce Farms Water Control District Canal No. 4 will be shifted to the west Intersection Improvements at Angle Road & St. Lucie Boulevard Construction Impacts: Work will done in phases to reduce the effects of construction impacts to the community. Temporary off-peak lane closures via flagging operations will be necessary. Access to all properties along the project will be maintained. Contact Information: Bing Wang, P.E. - FDOT Project Manager Phone: (954) 777-4406 Email: Bing.Wang@dot.state.fl.us __________________________________________________________________________________________________________________________________________________________________ Construction along Kings Highway consists of replacing the existing two lane undivided rural roadway with a newly constructed four-lane suburban divided roadway The proposed roadway will have: A 30-foot wide median (22-foot wide raised plus two 4-foot paved shoulders) Curb and gutters along the inside and outside 7-foot wide outside paved shoulders for use as bike lanes 12-foot wide shared use path adjacent to the road along the west side 6-Foot wide sidewalk along the east Side New lighting System New drainage System New flat slab bridges over the C-25 Canal and Canal No.1 North St. Lucie Water Control District Canal 32E will be shifted to the east Fort Pierce Farms Water Control District Canal No. 4 will be shifted to the west Intersection Improvements at Angle Road & St. Lucie Boulevard Construction Impacts: Work will done in phases to reduce the effects of construction impacts to the community. Temporary off-peak lane closures via flagging operations will be necessary. Access to all properties along the project will be maintained. As of August 19 ,2025 The project is include in the State's 2025 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$61,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
1
Bidding Soon
700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2026

Project location map

FL-713 & Kings Hwy, Fort Pierce, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.