Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Demolition, site work, renovation and addition to a mixed-use development in Brampton, Ontario. Completed plans call for the addition of a laboratory facility; for the demolition of a laboratory facility; for the renovation of a laboratory facility; and for site work for a laboratory facility.
The project will be implemented in two phases: Phase 1: Relocate and replace two CAD labs that will be displaced to accommodate the Veterinary Technician's lab expansion (Summer 2025). Phase 2: Convert the vacated CAD labs into two labs for the Veterinary Technician program (Fall 2025). The scope of work for Phase 2 includes, but is not limited to, the following activities: In-scope work: - Removal of existing furniture. - Demolition of existing walls, flooring, and ceiling to accommodate new finishes. - Floor scanning/X-ray prior to any cutting or trenching activities. - Mechanical and plumbing work, as required by the new layout. - Removal of all existing controls and installation of Delta Controls integrated into the Building Automation System (BAS). - Electrical work including lighting, power, and communication pathways. - Installation of IT data cabling and audiovisual (AV) systems. - Installation of security infrastructure including cameras, push buttons, and card readers. - Supply and installation of millwork, as required. The term of the contract is to be for a period of ten (10) months, with an option in favour of Sheridan to extend the contract on the same terms and conditions for an additional term of up to 1 x 2-months optional term. Deadline for questions is August 28 by 12 noon All questions must be submitted through electronically. Deadline for Issuing Addenda August 22, 2025
Post-Bid
Laboratories
$700,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2025
September 15, 2025
7899 McLaughlin Rd, Brampton, ON
Related To This Project
Brampton, ON
Bid Date: Sep 05 2025
Brampton, ON
Bid Date: Sep 18 2025
Brampton, ON
Bid Date: Oct 14 2025
Brampton, ON
Bid Date: Sep 10 2025
Brampton, ON
Bid Date: Sep 17 2025
Brampton, ON
Bid Date: Sep 12 2025
Brampton, ON
Bid Date: Oct 02 2025
Brampton, ON
Bid Date: Sep 19 2025
Brampton, ON
Bid Date: Oct 08 2025
Brampton, ON
Bid Date: Sep 09 2025
Brampton, ON
--
Brampton, ON
Bid Date: Sep 12 2025
Brampton, ON
Bid Date: Sep 02 2025
Brampton, ON
Bid Date: Aug 29 2025
Brampton, ON
Bid Date: Sep 15 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
