Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 11, 2025
Demolition and site work for a residential development in Ocala, Florida. Completed plans call for the demolition of a residential development; and for site work for a residential development.
Scope of Work: 1. The City of Ocala is seeking bids from qualified Florida licensed General, Residential, Demolition, or Building Contractors to perform demolition work 2. Contractor will provide all labour and equipment necessary to complete this project. ATTACHMENTS 1. Exhibit A - Scope of Work 2. Exhibit B - Price Proposal 3. Exhibit C - Asbestos Survey Report PRICING AND AWARD 1. Bids will be received on a lump sum basis. Lump sum amounts must include all direct and indirect costs. 2. Award will be made to the lowest bidder, not including optional line items, meeting all requirements outlined herein. This project consists of the following: 1. Termination of water and sewer connections at the property line (city meter/sewer laterals) prior to beginning demolition work. 2. Demolition and removal of a structure, overgrowth, structural debris, structure contents, improvements, and any junk on the property listed above. 3. Underbrush, overgrowth, and all debris must be removed from the property. All trees, except for those that are dead, shall remain. 4. Property shall be graded to final grade, using a box blade. 5. The ground where the buildings are removed will be leveled, and if on a grade, sodded. 6. Any fuel tanks found must be pumped, disconnected, crushed, and backfilled or pumped and completely removed from the property according to Chapter 62-761 of the Florida Administrative Code. 7. Public sidewalks and driveway aprons must remain intact. Any damage to sidewalks or driveway aprons by the Contractor will be repaired at the Contractor's expense. 8. Any septic tanks will be pumped, crushed and back-filled, according to City requirements, Florida Building and Plumbing codes, and the Marion County Health Department. 9. Any water wells will be capped according to City requirements and Florida Building and Plumbing codes. 10. All items will be removed from the property and properly disposed of. No items will be buried. Scheduling of demolition shall be coordinated through the City Rehabilitation Specialist, Chris Lewis, 629-8333 or 425-7686, clewis@ocalafl.gov. 2. Contractor shall promptly secure all necessary permits, inspections, and approvals required and allow inspection of all work by authorized personnel. 3. The asbestos survey is attached below. The contractor shall read it thoroughly and adhere to all DEP asbestos-related guidelines while demolishing the structure. 4. No work shall commence until the contractor has submitted proof of #62-257.900(1) - Notice of Demolition* to FDEP and provided proof of mailing to the City Project Manager. 5. Contractor must wait ten (10) business days (excluding holidays as observed by the State of Florida) after the confirmed delivery date, before starting demolition. Acceptable forms of proof are as follows: _ USPS Certified Mail receipt _ FedEx tracking receipt _ Similar mailing methods, where the delivery date can be verified. The Contractor shall complete all work performed under this contract under the policies and procedures of the City of Ocala and all applicable State and Federal laws, policies, procedures, and guidelines. 8. The Contractor shall obtain and pay for any licenses, additional equipment, dumping and/or disposal fees, etc., required to fulfill this contract. 9. The Contractor is responsible for purchasing the permits and ensuring that the hired subcontractors purchase their required permits. 10. The contractor must have sufficient equipment to complete the work. The City will not pay for rental of additional equipment, purchases of equipment, etc. 11. Contractor shall leave the property at once, without altercation, if advised to leave by law enforcement or a person claiming to be the property owner and/or property owner's representative. Immediately after leaving, contact the City Project Manager and advise them of the situation. 12. Contractor will be responsible for the inspector's overtime. 13. Provide on-site sanitary facilities as required by Governing agencies. 14. Contractor is responsible for any and all damages, including but not limited to buildings, curbing, pavement, landscaping, or irrigation systems caused by their activity. Should any public or private property be damaged or destroyed, the Contractor, at their expense, shall repair or make restoration as acceptable to the City of destroyed or damaged property within forty-eight (48) hours of notification from the City.
Award
Residential Subdivision
$7,414.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2025
September 25, 2025
1922 NW 2nd St, Ocala, FL
Related To This Project
Ocala, FL
Bid Date: Sep 16 2025
Ocala, FL
Bid Date: Sep 26 2025
Ocala, FL
Bid Date: Sep 03 2025
Ocala, FL
Bid Date: Oct 07 2025
Ocala, FL
Bid Date: Nov 11 2025
Ocala, FL
Bid Date: Oct 02 2025
Ocala, FL
Bid Date: Sep 29 2025
Ocala, FL
Bid Date: Sep 12 2025
Ocala, FL
Bid Date: Sep 12 2025
Ocala, FL
Bid Date: Sep 10 2025
Ocala, FL
Bid Date: Sep 03 2025
Ocala, FL
Bid Date: Aug 15 2025
Ocala, FL
Bid Date: Sep 03 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
