BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Site work and paving for a mixed-use development in Panama City, Florida. Working plans call for paving for a road / highway; and sidewalk / parking lot.

As of September 29, 2025, design is complete, however, right-of-way and construction are not funded. Engineer firm information has not been determined. Construction is not anticipated within the next five years. The intent of this project is to widen and realign approximately six miles of SR 388 from east of Burnt Mill Creek to SR 77. The existing two-lane roadway will be reconstructed as a four-lane divided roadway and will include a 12-foot shared-use path along the south side of the roadway. The eastern 1.5 miles of the project will realign SR 388 northward to intersect with SR 77 at CR 388 and a cul-de-sac will be constructed on existing SR 388 approximately 1 mile west of the existing SR 388 intersection at SR 77 and Edwards Road.

Final Planning

Roads / Highways

$6,152,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2031

Project location map

State Rd 388, Panama City, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.