BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Renovation of a military facility in Havelock, North Carolina. Completed plans call for the renovation of a military facility.

Work includes the replacement of the existing chiller and associated equipment at the VA Medical Center in Marion, Illinois. The contractor shall provide all labor, materials, tools, equipment, supervision, and services necessary to perform the work in accordance with the contract documents. The scope includes demolition and removal of the existing chiller, installation of a new chiller and associated components, electrical and mechanical connections, testing, and commissioning of the new system. **Location:** Marion VA Medical Center, 2401 W Main St, Marion, IL 62959, United States. Estimated Cost Range: Between $100,000.00 and $250,000.00 Contract Completion Date: All work shall be completed within 245 calendar days after award Requests for Information (RFIs): RFIs must be submitted email addresses above. The cut off for RFIs is 29 August 2025 by 1200 in order to process all inquiries by the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$250,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
41
Bidding Soon
533
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 9, 2025

Project location map

100 Roosevelt Blvd, Havelock, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.