BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a road / highway in Newberry, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

3.67 mi of paver placed surface seal, hot mix asphalt overlay, cold milling, overband crack seal, aggregate shoulder, guardrail, signage, detectable warning surfaces and pavement markings on M-123 from M-28 northerly to the railroad crossing in the village of Newberry, Luce County. This project includes a 3 year pavement performance warranty. 0% DBE Participation Required Net classification required for this project is 1390 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-6L. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No ST 48032 221787A 25A0892 Completion Date: 9/25/2026 MIDOT - 2509 031 - Paver Placed Surface Seal, Hot Mix Asphalt Overlay (M-123)

Award

Roads / Highways

$1,374,537.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
14
Bidding Soon
149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

May 4, 2026

Project location map

M-123, Newberry, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.