BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated October 30, 2025

Site work and paving for a sidewalk / parking lot in Harrison, New York. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000396261 Halstead Ave/Freemont Street/Harrison Ave Parking Lot Development (See attached spec.) Question Acceptance Deadline 09/19/2025 04:00 PM EDT Questions are submitted online No General Requirements - Bid Deposit Required - Certified Payroll - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % A Certified Check or Bid Bond for five (5%) percent of the total amount of the proposal must accompany each bid. Bids or proposals shall remain firm for a period of ninety days (90) days from the date of opening. All checks, except those of the three (3) lowest bidders, will be returned within five (5) days after opening of bids. *The Town of Harrison and Village of Harrison Board reserves the right to accept or reject any and all bids; to waive any informalities, to re-advertise for new bids or to accept any bid, which is in the best interest of the Town of Harrison and Village of Harrison, New York. SCOPE:- The general extent and Scope of the Work to be performed under this Contract, includes the Halstead Avenue/Fremont Street/Harrison Avenue Parking Lot Development Project and all other associated work, as described therein and set forth under the Specifications and Supplemental Specifications, if any, and shown and noted under the accompanying Drawings, and unless otherwise specified, includes the furnishing and delivering of all tools, materials and equipment, and labor, together with necessary supervision required for the completion, demolition, and installation called for under the several articles of the Specifications and Supplemental Specifications, if any, it being intended to include everything necessary to make every part of the same complete, (the omission of the words "furnish" and "install") therefore from any part of the Specifications shall not be deemed a waiver of the Contractor's obligation to furnish tools, plant and equipment, labor and materials required to complete any part of the work and place it in complete readiness for use. Construction is scheduled to begin on or about October 1, 2025 and be substantially completed by June 2026. PROJECT NO. NTOH0005.00

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

26

7

2

6

Subscribe For Documents

89 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
938
Active Projects
484
Bidding Soon
7,385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2025

October 1, 2025

Project location map

Multiple Locations, Harrison, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.