Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 4, 2025 at 8:00 PM
Updated September 5, 2025
Site work and paving for a mixed-use development in Tallahassee, Florida. Design plans call for site work for a road / highway; for paving for a sidewalk / parking lot; and water / sewer project.
Project Number:424009-4 The primary purpose of these projects is to increase the capacity of SR 363 (Woodville Highway) from SR 263 (US 319) Capital Circle Southeast to Gaile Avenue (Segment 4) by widening from 2 to 4 lanes and to improve traffic flow through the Four Points area from Gaile Avenue to Paul Russell Road with a loop configuration (Segment 5). These projects are needed in order to increase roadway capacity for people and goods traveling on Woodville Highway between southern Leon and Wakulla counties, and the City of Tallahassee. Improvements also include buffered bike lanes, re-alignment of the St. Marks Trail, sidewalk construction, widening of Ross Road and Tram Road, the extension of Tram Road, and the construction of 5 stormwater ponds and a closed storm sewer system. Segment 4 (SR 263 to Gaile Avenue) was funded for right-of-way acquisition beginning fiscal year 2018. Segment 5 (Gaile Avenue to Paul Russell Road) was funded for right-of-way acquisition beginning fiscal year 2019. Neither segment is funded for construction in the current FDOT Five-Year Work Program.
Design
Roads / Highways
$7,933,921.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
FL-363, Tallahassee, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
