BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work and paving for a road / highway in Sheffield, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Town of Sheffield is seeking bids for roadway milling and in-place Bituminous Concrete. The two roadways total 4 miles, are 23' wide. Milling is approximately 45,000 sq. yds. The approximate tonnage of Bituminous Concrete is 6,825 for a 2" top course, including tack coat. All other questions by prospective bidders concerning interpretations of this invitation to bid should be directed to: Jill Hughes, Assistant Town Administrator, ffiughesfesheffieldma.gov, 413-229-7000, Ext. 152. The project is located on East Stahl Road and Hewins Street. The Town shall have the right to increase or decrease these amounts depending on road conditions. Bidders should familiarize themselves with sections of roads to be paved. Road to be paint marked to identify the section to be paved. Questions in this regard should be directed to David Ruot, Highway Superintendent, at (413) 229-7030. Bid prices shall include all labor, equipment, and material for an in place product. All work is to be completed November 1, 2025. Bid packages will contain information on how to attend the bid opening. Awarding Authority is the Select Board. Each general bid shall be accompanied by a security or bond in the amount of 5% (percent) of the bid price. The successful bidder must furnish a 100% performance bond and 100% payment bond. No bidder may withdraw their bid for a period of thirty days after the actual date of opening of the bids. The minority employee percentage rate to be applied to this project will not be less than 5% (percent) in each class. This contract will contain a price adjustment for hot mix asphalt mixtures. Price adjustments will be in accordance with MassDOT period price adjustments for Hot Mix Asphalt. The base prices, dated July 2025 are as follows: Liquid Asphalt - $635.00 per ton, Diesel - $2.924 per gallon, Gasoline - $2.449 per gallon, Portland Cement - $425.13 per ton. The price adjustment will be based on the variance from the Base Price to the Period Price at the time the work is completed. The price adjustment must be reflected on the invoice. The contractor must be pre-qualified by MassDOT. Only bidders who are pre-qualified will be able to receive the bid package. Only bidders who are pre-qualified will be able to receive Bid Package. The Town of Sheffield reserves the right to reject any and all bids, to waive minor informalities or irregularities in any bid, and to make an award in any manner consistent with the law and deemed to be in the best interests of the Town. Bid Results : Hewins Street Palmer Paving $523,614 East Stahl Road Palmer Paving $174,911

Award

Roads / Highways

$698,525.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
266
Bidding Soon
3,730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

October 8, 2025

Project location map

E Stahl Rd & Hewins St, Sheffield, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.