Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work and paving for a road / highway in Greensboro, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

11.350 Miles of Concrete Rehabilitation on I-20/sr 402 Beginning West of Sr 15 and Extending to Sr 22 Ramp Wb. District - District 2 - Tennille, Area Office 5 - Madison Question Deadline 02/06/2026 - In Order to Accomplish this, All Questions and Comments Must Be Submitted by the Close of Business of the Friday Two Weeks Before the Letting. All Questions and Comments Received After the Friday Before the Week of the Letting Will Be Documented, but a Response Will Not Be Provided. Questions or Comments Call (404) 631-1147 For Those Contractors Who Are Currently Prequalified as a Gdot Construction Prequalified Contractor or Registered Subcontractor Through Gdot's Construction Bidding Administration Office, and Want to Be Prequalified to Perform Maintenance Projects Under the Routine Maintenance Services Program, There is Now a Modified Prime Contractor's Application Form Available. We Welcome You to Participate. The Application Form and All Applicable Documents, Resources and Other Guidance May Be Found on the Gdot Website. Proposal Guaranty in the Indicated Amount in the Form of a Certified Check, Cashier's Check or Bid Bond on the Form Issued by the Department. The Surety for Bid Bonds and Performance and Payment Bonds Shall Be a Company Acceptable as Surety on Federal Bonds and Listed in the Current Federal Register and Licensed in the State of Georgia. This Advertisement is Merely an Invitation for the Submission of Bids Which Will Be Considered as Offers for Performance of Work by the Submitting Party. The State Reserves the Right to Reject Any or All Bids. For Any Related Issues, Please Contact the Following Individual: Kimberly King 404-631-1972 Should You Have Questions or Need Assistance, Contact William Dunwoody at 404-631-1147. Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. GA DOT - 013 - Concrete Rehabilitation on I-20/SR 402 This work includes clearing, grubbing, removing and disposing of vegetation, buildings and debris within the entire Right-of-Way and easement areas adjacent to the Right-of-Way or as designated by the Engineer. Except, do not remove objects designated to remain or removed according to other sections of these specifications. This work also includes preserving (from injury and defacement) vegetation and objects designated to remain in place. This Work includes using best management practices (BMPs) shown on the Plans, ordered by the Engineer, or as required during the life of the Contract to control soil erosion and sedimentation through the use of any of the devices or methods referred to in this Section. This work includes placing embankments, backfilling structures, and constructing earth berms and surcharges with suitable material excavated under Section 204, Section 205, Section 206, and Section 207. Complete the work according to the lines, grades, and typical cross-sections shown on the plans or established by the Engineer. The work also includes preparing areas by backfilling stump holes and correcting surface irregularities where the embankment is to be constructed. This includes forming, compacting, and maintaining the embankment and placing and compacting approved material where unsuitable material has been removed. Payment for this work is included in other appropriate Pay Items unless a specific Pay Item is set up in the Contract. Apply all provisions of Section 161 to the work in this Section. Perform Shoulder Construction according to Section 216. This work includes constructing a base, subbase, or shoulder course composed of soil, or a mixture of soils, and stabilizing with Portland cement. Construct according to these Specifications and conform to the lines, grades, and typical sections shown on the plans or established by the Engineer. Requirements for the mix design, quality control and quality acceptance testing will be controlled by Standard Operating Procedures 29 (SOP 29). The provisions in Section 300 apply to this Item. This work includes constructing a cement stabilized base course by pulverizing the existing flexible pavement, underlying base and subgrade, and mixing with Portland cement. Construct according to these specifications and to the lines, grades, thickness, and typical cross-sections shown on the plans or established by the Engineer. This work includes furnishing, maintaining, transporting, and using Portable Changeable Message Signs (PCMS) according to these specifications at locations shown on the plans, in the Special Provisions, or as directed by the Engineer. This work includes furnishing and applying standard, wet weather, and audible profiled thermoplastic reflectorized pavement marking compound. Ensure markings conform to plan details and locations, these specifications, and the Manual on Uniform Traffic Control Devices. Thermoplastic traffic stripe consists of solid or broken (skip) lines, words, and symbols according to plan color, type, and location. Audible profiled thermoplastic markings consist of a thermoplastic stripe with raised bumps placed atop a thermoplastic stripe simultaneously as a system according to Plans and Specifications. This work includes preparing the ground, furnishing, planting, seeding, fertilizing, sodding, and mulching disturbed areas within the Right-of-Way limits and easement areas adjacent to the right-of-way as shown on the plans except as designated by the Engineer to remain natural. This work includes furnishing and placing erosion control mats (blankets) made of fiberglass, excelsior, jute mesh, synthetic, or coconut over grass areas prepared according to Section 700 for permanent grass. Place according to the plans or as directed by the Engineer. This specification is not applicable for waterways.

Award

Roads / Highways

$9,994,102.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
6
Bidding Soon
1,026
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

April 21, 2026

Project location map

I-20, Greensboro, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.