Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 10, 2025 at 8:00 PM
Updated October 11, 2025
Demolition and site work for a residential development in Callahan, Florida. Completed plans call for the demolition of a residential development; and for site work for a residential development.
Question Deadline 09/12/2025 at 4:00 PM ET Online Q&A Yes The Contractor shall furnish all necessary materials, equipment, tools, labor and supervision necessary to perform in a competent and workmanlike manner, all of the Rehabilitation Work provided for in the Contract relating to the described property. 2. Only rehabilitation work as described in the Scope of Work shall be performed. No work will be provided beyond that which is included in the Scope of Work. 3. Before installing any work, the Contractor shall carefully study and compare the Contract Documents and the property and shall report at once and in writing any error, omission, or inconsistency in the documents. A Change Order shall approve any necessary changes. If the Contractor fails to report any error, omission or inconsistency and installs work according to the error, omission, or inconsistency, they shall bear all liability and cost to complete suchwork. 4. All work shall be completed in a professional workmanship-like manner and in compliance with all building codes, other applicable laws, and SHIP general requirements. 5. To the extent required by law, all contract work shall be performed by individuals duly licensed and authorized by law to perform said work. 6. Contractor may at its discretion engage subcontractors to perform work hereunder provided. Contractor shall fully pay said subcontractors and in all instances remain responsible for the proper completion of the Contract. 7. Contractor shall furnish the SHIP program the appropriate releases or waivers of lien for all work performed or materials provided before the final payment for contract work shall bedue. 8. Contractor shall at its own expense obtain all permits and insurances necessary for the work to be performed. Note: Insurance coverages are attached herein as Attachment "C" 9. Contractor shall remove all debris and leave the premises in broom-clean condition. 10. Contractor has one-hundred twenty (120) days to complete the project after notice to proceed. 11. Contractor must supply their own utilities, including bathroom facilities and temporary power pole. 12. Contractor must supply a POD for storage of homeowner's items. 13. Contractor will supply Energy Star Rated and Green Building Standard appliances that are all matching. Appliances to be supplied are a Refrigerator, a Stove, a Vent Hood, and a Hot Water Heater. Additionally, contractor is responsible for installing Washer and Dryer hookups, but not the actual appliances. 14. Contractor is responsible for disconnecting utilities and cable. 15. Contractor will follow and comply with Florida Department of Environmental Protection requirements for Lead and Asbestos testing during demolition. The goal for the SHIP program is to aid in the rehabilitation of owner-occupied housing in Nassau County. This project is for the demolition and rebuilding of the current home using County supplied home plans.
Bid Results
Residential Subdivision
$134,500.00
Public - County
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2025
November 10, 2025
55403 Cook Dr.,, Callahan, FL
Related To This Project
Callahan, FL
--
Callahan, FL
Bid Date: Oct 09 2025
Callahan, FL
Bid Date: Oct 09 2025
Callahan, FL
Bid Date: May 28 2025
Callahan, FL
Bid Date: May 14 2025
Callahan, FL
--
Callahan, FL
--
Callahan, FL
--
Callahan, FL
Bid Date: Apr 17 2025
Callahan, FL
Bid Date: Mar 05 2025
Callahan, FL
--
Callahan, FL
Bid Date: Dec 17 2024
Callahan, FL
Bid Date: Nov 14 2024
Callahan, FL
Bid Date: Oct 22 2024
Callahan, FL
Bid Date: Oct 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
