Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 2, 2025 at 8:00 PM
Updated September 4, 2025
Renovation of an educational facility in Mobile, Alabama. Completed plans call for the renovation of a educational facility.
Bid Cafeteria Equipment -Installed A. If you have any questions regarding this bid, you may contact Cynthia Martin by email at cpmartin@mcpss.com or by phone at (251 ) 221 -4473. All questions must be directed to the buyer listed on the particular bid. Clarification will be made only by written addenda sent to all registered bidders. The Board will not be responsible for verbal answers regarding the intent or meaning ofthe specifications or for any verbal instructions given prior to the bid opening. Bidders shall not contact any member ofthe Mobile County School Board, Superintendent, or Staff regarding this bid prior to such bid has been Board approved. Any such contact shall be cause for rejection ofyour proposal. Equipment shall be installed according to instructions provided when an item is ordered or to replace an existing piece of equipment tagged for removal. Bidder shall furnish, deliver, assemble, and install all items required. Installation of each item shall be in accordance with (a) city and/or county plumbing and electrical codes and with (b) the manufacturers recommendations and shall include all labor and materials required to provide working units. Bidder to provide all water, gas, and electrical connections required within 6*0" of machine. Gas, connections will be of nonflexible material. PVC will not be used to drain dishwashers, steamers and sinks. An appropriate gas pressure regulator will be required for each appliance installed that uses natural gas. In addition, bidder shall furnish all labor and material to move and install some existing equipment to accommodate new equipment and to remove existing equipment at some locations as described herein. All items which require removal shall be delivered by the bidder to a storage location designated by the Board. Bidder shall leave each job site broom clean and shall remove all trash and debris associated with their work from the job site. Cafeteria Equipment Specifications Page 5 2. Bidder shall coordinate all installations with the Boards Maintenance Department at (251) 221-5508. All installation procedures which require water, gas or electrical connections shall be completed by an appropriate professional. In addition, all work performed by the bidder must be approved by the Maintenance Department priorto final acceptance and payment.
Post-Bid
Educational
$75,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
October 3, 2025
Multiple Locations, Mobile, AL
Related To This Project
Mobile, AL
--
Mobile, AL
--
Mobile, AL
Bid Date: Sep 17 2025
Mobile, AL
Bid Date: Sep 10 2025
Mobile, AL
Bid Date: Oct 06 2025
Mobile, AL
Bid Date: Sep 25 2025
Mobile, AL
Bid Date: Sep 03 2025
Mobile, AL
Bid Date: Oct 07 2025
Mobile, AL
Bid Date: Sep 10 2025
Mobile, AL
--
Mobile, AL
Bid Date: Oct 21 2025
Mobile, AL
Bid Date: Sep 08 2025
Mobile, AL
Bid Date: Sep 10 2025
Mobile, AL
Bid Date: Aug 13 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
