Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 16, 2025 at 8:00 PM

Updated September 17, 2025

Site work for a water / sewer project in Fort Cobb, Oklahoma. Completed plans call for site work for a water / sewer project.

Description: Remove existing meters and replace with AMI meters including antennas. Meters range in size from 5/8 to 6. Pre-Qualification: Yes SCOPE OF WORK BY THE CONTRACTOR 1. Water Meter Replacement shall consist of the following: a. The contract consists of furnishing and installing all materials listed in the bid schedule and described in the specifications

Bid Results

Water / Sewer

$174,227.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
72
Bidding Soon
729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

October 13, 2025

Project location map

125 Main St, Fort Cobb, OK

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed