BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2025 at 8:00 PM

Updated September 23, 2025

Site work and paving for a mixed-use development in Marystown, Newfoundland. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Closing Time: 12:00 PM (NT) ** Please note that there has been 2 addendum issued for this project. ** Question Acceptance Deadline 2025/09/20 12:00:00 PM NDT Questions are submitted online No All enquiries related to the Open Call for Bids must be directed, in writing, to the Contract Administrator identified in the Open Call for Bids. The Work will be substantially performed within 3 months from the date of notification of award of contract or November 30, 2025, whichever is later. Contractors are advised the PROJECT shall include, but will not be limited to, the scope as outlined in the following summary. Rehabilitate Route 220, km 2.96 to km 6.52 Mobilize and set up traffic control, Ditching, grubbing, and clearing of various sections of the right of way, Replacement of deteriorated culverts with polymer coated culverts, Asphaltic patching of culvert cuts, Replacement of driveway and sign island culverts with aluminized culverts complete with hand laid sod rip rap, Spot level selected rough areas of pavement, Resurface roadway with 40mm average thickness levelling course and 50mm surface course asphalt complete with tack coat between all layers, Adjustment of manholes and water valves, Shoulder the roadway with granular 'B' as directed by the engineer, Replacement of signage, including signage associated with the Route 220, 220A intersection at Creston South, Site clean up and demobilization. This section of Route 220 is built to an RLU 80 Modified standard The intersection of Route 220 and Route 210 in Marystown is located at km 0.0 on Route 220. Rehabilitate Route 220A, km 0.84 to km 1.00, Route 220-10, km 0.0 to km 0.84 Mobilize and set up traffic control, Ditching, grubbing, and clearing of various sections of the right of way, Replacement of deteriorated culverts with polymer coated and aluminum culverts, Asphaltic patching of culvert cuts, Replacement of driveway and sign island culverts with aluminized culverts complete with hand laid sod rip rap, Spot level selected rough areas of pavement, Resurface roadway with 30mm average thickness levelling course and 50mm surface course asphalt complete with tack coat between all layers, Adjustment of manholes and water valves, Shoulder the roadway with granular 'B' as directed by the engineer, Site clean up and demobilization. This section of Route 220A and Route 220-10 are built to an RLU 70 Modified standard The intersection of Route 210 and Route 220A is located at km 0.0 on Route 220A Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Bid Results

Roads / Highways

$5,584,404.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
64
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2025

October 21, 2025

Project location map

Multiple Locations, Marystown, NL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.