BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a water / sewer project in Pittsburgh, Pennsylvania. Working plans call for site work for a water / sewer project.

**As of December 4, 2025, the project has been cancelled. Question Deadline 09/06/2025 at 4:00 PM ET CD 49-3.12.7 EBMA Combined Sewer Outfall Rehabilitation Project consists of rehabilitation of five (5) river back-flow devices, including removal and replacement of check valves and headwalls; installation of rip rap stone; clearing vegetation and ensuring site access; erosion and sedimentation control; locate underground utilities; secure required permits; conduct field engineering; other appurtenances as required by municipal engineer. Proposals to receive consideration must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of The Steel Rivers Council of Governments and in an amount equal to ten percent (10%) of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will immediately enter into Agreement after the Notice of Award of the Contract and commence start of contracted work immediately thereafter. Compliance is required with the Davis-Bacon Act and other Federal Labor Standard Provisions; Title VI and other applicable provisions of the Civil Rights Act of 1964; the Department of Labor Equal Opportunity Clause (41 CFR 60 - 1.4); Section 109 of the Housing and Community Development Act of 1974; Executive Order 11625 (Utilization of Minority Business Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise); in compliance with Section 504 of the Rehabilitation Act of 1973 and the Americans with Disabilities Act of 1990; the Allegheny County MBE/WBE Program enacted July, 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance #6867-12, setting forth goals of 5 percent Veteran-Owned Small Businesses. Further, notice is hereby given that this is a Section 3 Project under the Housing and Urban Development Act of 1968, (as amended) and must to the greatest extent feasible, utilize lower income residents for employment and training opportunities and Section 3 Business concerns and all contracts and subcontracts for this project shall contain the "Section 3 Clause" as set forth in 24 CFR, Part 135.38. Moreover, compliance is required by the prime contractor and all subcontractors with the Federal General Conditions included in the contract documents between the County of Allegheny through its Department of Economic Development and the operating agency. These Federal General Conditions are to be incorporated by reference into all construction contracts between operating agency and contractor, contractor and subcontractor(s), and subcontractor(s) and lower tiered subcontractor(s). The SRCOG reserves the right to waive any informalities or to reject any or all proposals, or any part thereof. No Bidder may reject their bid for the period as specified in the Project Bid documents after the scheduled closing time for Receipt of Bids. 1. Procurement of all materials and appurtenances, provision of all labor, equipment, supervision, and safety implementations to perform rehabilitation of Combine Sewer Outfalls (CSOs) #3: installation, inspection, maintenance, and replacement of all E&SC BMPs required to perform all work within the stream channel, the removal of the existing 48" RCP pipe and endwall, remove 24" of channel sediment as depicted on drawings and replace with #3 stone to the required elevation to reinstall the existing endwall on existing pipe within the channel, and replacement of "duckbill" check valves, [(E&SC) BMPs include but not limited to (compost filter sock, stream diversion, and cofferdam, dewatering, and sediment retention, etc.)], installation of Gabion baskets as show and described on contract drawings, interlink Gabion baskets with 6 gauge wire, as well as secure top row of baskets to stream embankment with 6" helical anchors and cables spaces every 2-feet, backfill behind Gabion baskets and existing RCP pipe with #3 limestone aggregate to the top of the baskets and slope 3" in height per 1-foot horizontal, perform all required clearing and grubbing and tree trimming/removal required to perform work, and all temporary and permanent surface restoration including lawn, concrete sidewalk, bituminous roadway and driveway as defined and depicted within the Contract Documents. Procurement of all materials and appurtenances, provision of all labor, equipment, supervision, and safety implementations to perform rehabilitation of Combine Sewer Outfalls (CSOs) #5, #6, #7, and #8; the removal and replacement of "duckbill" check valves, installation and maintenance of all erosion and sedimentation control (E&SC) BMPs (compost filter sock, stream diversion, and cofferdam, dewatering, sedimentation retention, etc.), all required tree trimming/removal required to perform work, and all temporary and permanent surface restoration including lawn, concrete sidewalk, bituminous roadway and driveway as defined and depicted within the Contract Documents. 5 percent goal for Veteran Owned Small Businesses (VOSB).

Final Planning

Water / Sewer

$269,700.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
114
Bidding Soon
1,768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

June 1, 2026

Project location map

Multiple Locations, Pittsburgh, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.