BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a municipal facility in Goleta, California. Conceptual plans call for site work for a municipal facility.

The successful Consultant must complete 100% Bid Documents, provide engineering support through the bid process and construction of the Project. Question Deadline 09/05/2025 at 5:00 PM PT Online Q&A Yes Response Types Cost File Response File Type of Award Lump Sum For the purposes of this RFQ/P, it can be assumed that the County will obtain necessary environmental/regulatory permits and right of way acquisition. Tajiguas is located in the County of Santa Barbara and situated within the Canada de la Pila, a small coastal canyon on the southern flank of the Santa Ynez Mountains. Tajiguas is located approximately one-quarter mile north of Highway 101, which provides access to the site. Since operation began, the Anaerobic Digestion Facility (ADF) has experienced operational slowdowns caused by siloxane buildup in the CHP engines. The Project involves a part of the ADF biogas treatment system, and consists of upgrading the existing hydrogen sulfide (H2S) treatment system to better remove siloxanes. In the first phase, the consultant will re-design the H2S treatment vessels' stainless steel piping from its current in-parallel configuration, to an in-series configuration. In the second phase, the consultant will develop recommendations for possible testing of different filtering media to maximize H2S and Siloxane removal. The ADF produces biogas with a fluctuating average of ~500 SCFM. This flowrate could increase in the near future on account of ongoing organics diversion efforts. The source of the biogas' pressure comes from the digesters, which is assisted by a blower downstream of the filtering vessels providing additional pressure required for the CHP engines. The consultant will ensure that positive pressure is maintained between the treatment vessels once arranged in series. Construction of the project will be competitively bid. The construction contract is anticipated to be awarded in early February 2026 with work starting March 1, 2026. The contractor has 63 working days to complete the project. The subject project will be constructed concurrently with other work or projects at the landfill including operations at the ADF, daily landfill operations, and other general civil improvements. Construction of the project will need to be conducted in such a way as to minimize interference with other work at the site. The method of Contractor Selection has not been Determined at this time. Selection and Notification 09/25/2025 Award Date 10/09/2025 Notice to Proceed/Contract Execution 10/09/2025 100% Bid Package Complete 11/21/2025 Anticipated Start of Construction 03/01/2026 Final Invoice/End Date of Project Construction (Estimated) 04/29/2026

Conceptual

Municipal

$300,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
43
Bidding Soon
732
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2026

Project location map

14470 Calle Real, Goleta, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.