Site work for a water / sewer project in Whitney Point, New York. Completed plans call for site work for a water / sewer project.

Installation of a ground-mounted solar array with solar inverters at Whitney Point Dam in Broome County, New York. The contractor shall provide all labor, materials, and services to develop a system design, equipment procurement plan, construction work plan, and schedule. The system must be islandable, non-grid-tied, and capable of powering office facilities (maintenance shop, storage building, and project office) during daytime hours, with battery backup for at least 8 hours and an optional 16-hour configuration. The contractor must ensure compliance with all applicable standards, codes, and utility requirements, and manage incentives, rebates, and renewable energy certificates (RECs), which will remain the property of the Whitney Point Project. The design must include fixed-tilt photovoltaic modules, inverter and module specifications, conceptual drawings, and performance criteria. The system must integrate with the existing electrical infrastructure and switch between PV/battery, utility grid, and generator power as needed. Technical requirements include concrete foundations, PV modules with minimum 15% efficiency, UL-listed inverters with MPPT and islanding capability, battery systems with depth-of-discharge protection, and corrosion-resistant ground mounting structures. Acceptance testing must be performed by NABCEP-certified professionals. The contractor is responsible for design documents, submittals, construction, quality control, safety, commissioning, training, and maintenance. Work must be completed within 180 days of notice to proceed, between April and September, during standard duty hours. Security, environmental, and safety regulations must be followed, including EM 385-1-1 compliance. Deliverables include pre- and post-work submittals, warranties, manuals, and as-built drawings.

Award

Water / Sewer

$325,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
114
Bidding Soon
1,393
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

September 23, 2025

Project location map

To Be Determined, Whitney Point, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.