BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Site work, paving and remodeling of a mixed-use development in Sacramento, California. Completed plans call for the remodel of a clubhouse / community center; for site work for a clubhouse / community center; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Washington Community Center Remodel ALTERNATES: If alternate bids are called for, identify these in the Best Value Proposal, and these will be reviewed as part of the Budget Validation and Target Value Design. AWARD: Project will be awarded using the Best Value Method (see exhibit attached Request for Proposals). PROJECT DURATION: The project is considered to take 120 calendar days. Bidder should provide their schedule assumptions which will be scored as part of the Schedule Management. ESTIMATED PROJECT VALUE: The project is estimated at Seven Hundred and Twenty-Five Dollars ($725,000) which includes the covered walkway (Add Alternate 1). All surety bonds must be provided by sureties as specifically listed on Federal Circular 570. No exceptions will be permitted. A 100% Payment Bond will be required prior within Ten 10 calendar days of award. These bonds shall be in the form called for in the Contract Documents. A 100% Performance Bond will be required within Ten 10 calendar days of award. These bonds shall be in the form called for in the Contract Documents. Payment and Performance Bonds issued on forms other than the Bid Bond form contained within the contract documents will be grounds for disqualification. PAYMENT RETENTION: Owner will retain 5% of the amount of any progress payments as retention. REJECTION OF BIDS Washington CC will have the right to reject any or all bids. Washington CC will have the right to reject any Bid not completed as required by the Bidding Documents, or a Bid which is in any other way incomplete or irregular. CONTRACT AND PROCEDURAL QUESTIONS AND CLAIRIFICATIONS: Contract And Procedural Questions shall be addressed to the following: Bruss Consulting Services LLC. Attn: Dave Bruss Davebruss@brusscs.com

Award

Clubhouse / Community Centers

$677,050.00

Public - State/Provincial

Paving, Remodeling, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
418
Active Projects
204
Bidding Soon
2,910
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 1, 2025

Project location map

400 16th St, Sacramento, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.