BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 17, 2025

Renovation of a financial development in Troy, New York. Completed plans call for the renovation of a financial development.

Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 10% Service-Disabled Veteran-Owned Business Contracting Goal: 10% Contract term: Completion by 10/31/2025 County(ies): Rensselaer The Troy Community Land Bank has prepared a scope of work for 3034 Sixth Avenue in Troy, NY. The objective of this project is to remedy fundamental problems that are causing deterioration. Questions to TCLB Monday September 5 Questions regarding this RFP must be submitted to Paul Donnelly Email: paul.donnelly@troycommunitylandbank.org Painting Sand, chip away loose stone and paint at 5 damaged stone sill locations on the front facade. Prep, prime, and paint patched sill areas using Edison SYSTEM 45, matching existing profile and color. Prep and paint damaged wood trim on right front door panel (approx. 2 LF). Prep, prime, and paint deteriorated panel trim below the south side of the 2nd story bay window (approx. 2 LF). Patch and paint area above front door after removing fake camera. Prep, prime, and paint (in 3-color scheme) the following: - Wooden cornice - Wooden bay - Window trim (10 windows) - Sandstone sill and course - Brick (extend brick painting approx. 1' from front corner on north elevation and 10' on south elevation) Masonry Remove front stairs; install new precast stairs with 5 risers and integral metal railing. Repoint lower (2) courses of brick masonry on the front facade. Repoint lower (3) courses over ~20 SF area from front corner and ~30 SF about 3' below roofline on south elevation. Relay spalled/deteriorated bricks (approx. 10 bricks for repair, 3 bricks on south and front elevations). Repoint and relay ~5 bricks at front door threshold after patch removal. Clean stone sills using low-pressure wash and masonry cleaning product. Raise basement window sill height by 5" with new concrete sill Carpentry/Windows Remove and replace: - Vinyl double-hung window (2'-9" x 6'-6"), rightmost 1st story window. - (2) white vinyl window screens, 1st story. - (2) vinyl windows and wood barrier at basement level (install new vinyl double-hung windows, 2'-9" x 3'-0"). Remove and install: - Matching wood trim (right front door, 2 LF). - Deteriorated panel trim under 2nd story bay window (2 LF). - Metal mail slot on front door.

Post-Bid

Financial

$18,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
338
Active Projects
196
Bidding Soon
2,217
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2025

October 16, 2025

Project location map

3034 6th Ave, Troy, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.