BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2025 at 7:00 PM

Updated December 27, 2025

New construction, renovation and addition to an educational facility in Terrell, Texas. Completed plans call for the addition of a educational facility; for the construction of a educational facility; and for the renovation of a educational facility.

PROJECT NO. 1: Terrell High School Additions and Renovations, 701 Town N. Drive, Terrell, TX 75160 PROJECT NO. 2: Career and Technical Education Additions & Renovations, 701 Town N. Drive, Terrell, TX 75160 PROJECT NO. 3: New Agriculture Building, 701 Town N. Drive, Terrell, TX 75160 PROJECT NO. 4: Herman Furlough Jr. Middle School, 1351 Colquitt Rd., Terrell Texas 75160 PROJECT NO. 5: New Elementary School, Address Unknown PROJECT NO. 6: J.W. Long Elementary School, 300 Creekside Dr., Terrell, Texas 75160 PROJECT NO. 7: W.H. Burnett Early Childhood Center, 921 S. Rockwall Ave. Terrell, Texas 75160 PROJECT NO. 8: Global Leadership Academy, 305 West College Street, Terrell, Texas 75160 PROJECT NO. 9: Bruce Wood Elementary School, 121 Poetry Road, Terrell, Texas 75160 PROJECT NO. 10: Gilbert Willie Sr. Elementary School, 1400 S. Rockwall Street, Terrell, Texas 75160 Question Cut Off Date: 9/11/2025 10:00:00 AM (CT) Bid Contact Information Donna Wilcox, Director of Purchasing Terrell Independent School District 700 North Catherine Street Terrell, TX 75160 USA 972 (563) 7504 x13323 donna.wilcox@terrellisd.org Texas Government Code Chapter 2269, Subchapter F, it is the intention of Terrell Independent School District (the district) to select a Construction Manager-At-Risk (CMaR), via a two-step Request for Qualifications (RFQ)/Request of Proposals (RFP) process, for the construction of the 2025 Bond Projects and selected non-bond related projects in the district. Detailed information on the requirements for the Statements of Qualifications can be found under the Attachments tab. This document also contains a list of the 2025 Bond Projects, and the evaluation criteria for both step 1 and step 2 of this RFQ process. The district intends to use the A133-2019 and A201-2017 Construction Contract as modified by the District, subject to revisions agreed upon by the parties. A sample contract document can be found under the Attachments tab. The Texas Prevailing Wage Law will be administered in accordance with the General Conditions provided. The Prevailing Wage Rates can be found under the Attachments tab.

Bid Results

Educational

$273,400,000.00

Public - City

Addition, New Construction, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
234
Bidding Soon
3,798
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2025

March 2, 2026

Project location map

Multiple Locations, Terrell, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.