BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated October 3, 2025

Renovation of a municipal facility in Miami, Florida. Completed plans call for the renovation of a municipal facility.

License Requirements - At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and Request for Price Quotation (RPQ) and Contract Documents, the Bidder and all its subcontractor must hold a valid, current, and active State and/or Miami-Dade County contractor's license consistent with the requirements of the Scope of Work. A V A I L A B L E MCC 7360 PLAN - REQUEST FOR PRICE QUOTATION (RPQ) 2) Department of Solid Waste Management - Carlos Primo - 305-514-6626 RPQ No: 18612-25, 50 YEAR RECERTIFICATION CENTRAL TRANSFER STATION BUILDING 1 - STRUCTURAL AND ELECTRIC ESTIMATED COST: $3,067,891.70 LICENSE REQUIREMENT: General Building Contractor, Building Contractor SCOPE OF WORK: The work consists of furnishing all materials, labor, and equipment necessary for the 50 Year Recertification Central Transfer Station Building #1 Structural and Electrical Repairs located at 1150 NW 20th Street, Miami, FL 33127. These repairs are required to comply with the minimum inspection procedural guidelines for Building Recertification, Parking Lot Illumination and Parking Lot Guardrails. PRIME CONTRACTOR MUST BE ABLE TO PULL MASTER PERMIT. SPECIAL REQUIREMENTS: Bidder must demonstrate that it has full-time personnel with the necessary experience to perform Project's Scope of Work. Bidder shall provide a list of no less than five (5) references who can confirm that they have developed similar repair, rehabilitation and restoration of concrete structures projects in facilities of similar scope, size, materials, and environmental exposures in the last seven (7) years. As preferred the years of experience requested for the Contractor in similar recertification projects. Prime or Subcontractor is preferred to have previous experience installing Emerytop400 or Owner Approved Equal slab topping within the past 3 years. Prime shall coordinate with the operations personnel and with the Engineer to phase the Work in a manner to minimize impact to circulation and operation of vehicles and equipment and other operations. LICENSE QUALIFICATIONS OF CONTRACTORS: A) All Contractors must hold a current valid State of Florida Certified General Contractor License, as required by the Florida Building Code, for the types of Work covered by the Contract at the time of RPQ submission and maintain the same throughout the duration of the project. The certificate(s) is to be issued by: The State of Florida Construction Industry Licensing Board, pursuant to the provisions of Section 489.115 of the Florida Statute and registered with the Miami-Dade County Building Department or, The Dade County Construction Trades Qualifying Board, pursuant to the provisions of Section 10-3(a) of the County Code. Holders of Miami-Dade County Certificates of Competency must also hold Certificates of Registration issued by the State of Florida Construction Licensing Board, pursuant to the provisions of Section 489.115 or Section 489.117 of the Florida Statutes. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work. Question Deadline 09/11/2025 at 3:00 PM ET Submit Request for Information (RFI's) to primo@miamidade.gov and gibsy.nunezdavila@miamidade.gov with copy to clerkbcc@miamidade.gov

Post-Bid

Municipal

$3,067,891.00

Public - County

Renovation

30

24

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
104
Bidding Soon
1,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

November 17, 2025

Project location map

1150 NW 20th Street, Miami, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.