BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

This is a service / maintenance or supply contract in San Juan, Texas. Contact the soliciting agency for additional information.

The Engineer will support the Owner through bidding, permitting, and construction by preparing bid documents, securing permits, monitoring progress and quality, reviewing submittals and payments, advising on materials and changes, conducting final inspections, and providing record drawings. Project may be funded in part through the Texas Water Development Board's (TWDB) Clean Water State Revolving Fund (CWSRF). Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this RFQ, or any resulting IFB or contract. Respondents must provide Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment without regard to race, color, national origin, sex, religion, age, or handicap. Respondent shall carry out applicable requirements of 40 CFR Part 33 in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Projects may be funded in part through the Environmental Protection Agency's (EPA). EPA rules require that applicants and prime contractors/consultants make a good faith effort to award a fair share of contracts, subcontracts, and procurements in a nondiscriminatory manner through demonstration of the six affirmative steps for Construction, Supplies, Equipment, and Services procurement categories. The City reserves the right to negotiate with any and all firms that submit qualifications, as per the Texas Professional Services Procurement Act, Texas Government Code Section 2254.004 and Texas Local Government Code Section 271.118. The City of San Juan will evaluate the Statements of Qualifications of the firms on the basis of technical ability, experience, and ability to perform the work. The City of San Juan does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in employment or provision of services, programs or activities. The City of San Juan reserves the right to refuse and reject any or all qualifications and to waive any or all formalities or technicalities or to accept the qualification to be the best and most advantageous to the City, and hold the qualification for a period of 90 days without taking action. Qualifications submitted past the aforementioned date and time will not be accepted. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
1
Bidding Soon
261
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.