Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 22, 2025 at 8:00 PM
Updated October 2, 2025
Site work and new construction of a pre-engineered storage facility in Inglis, Florida. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
40 x 70 x 16 fully open pole barn kit to be delivered and constructed to completion at the Town of Inglis water plant site at 151 Elm Street Inglis Florida 34449: All labor and materials to be included unless otherwise noted. SPECIFICATIONS: Commercial engineered drawing (3) copies 130 MPH wind rating (minimum) Gabel pitch 3/12 minimum Minimum gable wall opening clearance height 14 Minimum eve wall opening clearance height 12-6 18 overhang on all 4 sides 10 eve wall openings 8x8 pressure treated post (minimum) 15 80# bags of 4000 psi concrete per post (concrete) only supplied by town (3) pieces of # 5 rebar per post (minimum) 2 engineered steel trusses (minimum) 2x6 #2 D-F yellow pine purlins at a maximum of 24 on center 29g Galvalume roof material 26g Galvalume ridge cap 26g Galvalume gable rack Lifetime screws (permitting will be supplied by the town of Inglis) Installers to bag and stack construction waste for Towns removal. All local, county and state building codes must be adhered to Upon boring of holes for post if caving or water intrusion mandates the need for Sono tubes cost of Sono tubes and labor will be added to contract price Bid package must include: Bid prices for all-inclusive materials and labor Price for Sono tube and labor (if required) Materials list and specifications Dimensional drawing Artist rendering Copy of current state builders license Copy of current liability insurance Copy of current worker comp insurance Letter of financial sovereignty from company bank. Upon winning contract acceptance: Builder will need a Town of Inglis business permit Payment terms will be 50% down payment ten (10) days from acceptance of contract Final payment is at completion with exception of a two thousand-dollar ($2000.00) retainer to be released when final inspection is passed. All Materials are to be on site within 90 days of permit issued Construction is to be completed 30 days after materials arrive on site. A fifty ($50.00) dollar a day penalty will be assessed for every day pass the above stated timeline to be withheld from completion payment Any and all delays to the stated contract timeline must be approved by the Town of Inglis Any and All change orders must be approved by the Town of Inglis
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$34,600.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2025
October 15, 2025
151 Elm St, Inglis, FL
Related To This Project
Inglis, FL
Bid Date: May 21 2025
Inglis, FL
Bid Date: Mar 10 2025
Inglis, FL
Bid Date: Dec 17 2024
Inglis, FL
--
Inglis, FL
Bid Date: Dec 29 2023
Inglis, FL
Bid Date: Sep 29 2023
Clearwater, FL
--
Sanford, FL
Bid Date: Sep 18 2025
Sarasota, FL
Bid Date: Sep 11 2025
Welaka, FL
Bid Date: Dec 16 2025
Riverview, FL
Bid Date: Sep 25 2025
Naples, FL
Bid Date: Oct 29 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
