Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated August 29, 2025
Site work for a bridge / tunnel in Livermore, California. Conceptual plans call for site work for a bridge / tunnel.
The creek crossing for the Arroyo Las Positas at Airway Boulevard consists of three arch culverts. The culverts prevent the natural meandering of the channel and have caused severe sedimentation under and around the culvert causing flooding on the golf course and airport facilities. This project will remove the existing Airway Boulevard culvert and replace it with a free-span bridge, restore approximately 3,000 feet of channel and include roadway improvements. The project design will include connectors from the bike lanes on Airway Boulevard to future trail T5 in the Active Transportation Plan (ATP), west of Airway Boulevard along the north edge of the Arroyo Las Positas. This will allow the channel to become more stable by permitting natural sediment transport. This project is one of several flood mitigation measures planned for the Arroyo Las Positas area. Other projects are Golf Course Damage Repairs SD202132, Arroyo Las Positas Desilting Through Las Positas Golf Course SD202015, and Las Positas Golf Course Clubhouse Parking Lot Drainage Improvements, SD202525. The City has applied for a FEMA Hazard Mitigation Grant to replace the existing three cell arch culverts at Airway Boulevard with a clear span bridge. Project funding is for preliminary design, environmental, and grant applications. As of August 28 ,2025 ,This project is included in the City's 2025-2045 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$787,500.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Airway Blvd, Livermore, CA
Related To This Project
Livermore, CA
Bid Date: Oct 07 2025
Livermore, CA
Bid Date: Oct 22 2025
Livermore, CA
Bid Date: Dec 04 2025
Livermore, CA
Bid Date: Nov 06 2025
Livermore, CA
Bid Date: Oct 20 2025
Livermore, CA
--
Livermore, CA
--
Livermore, CA
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
