Published September 4, 2025 at 8:00 PM
Updated September 12, 2025
This is a service / maintenance or supply contract in Sugar Land, Texas. Contact the soliciting agency for additional information.
The City of Sugar Land Annual Drainage Maintenance and Repair Contract provides an on-call resource for maintaining and improving the City's storm sewer infrastructure. This contract establishes unit prices for a variety of drainage-related tasks, ensuring timely response and cost control for both planned maintenance and emergency repairs. Work includes tasks such as joint sealing, storm sewer removal and replacement, installation of reinforced concrete pipe (RCP) of various sizes, structure rehabilitation, inlet adjustments, and other associated drainage improvements. Question Deadline 09/04/2025 at 3:00 PM CT Please post all questions to online. Questions Answered and Addendum posted: September 5, 2025, 3:00pm The City Council will award the contract as provided in the Invitation to Bid. The City of Sugar Land will give notice of the contract award within ninety (90) calendar days after the opening date and time. A Bidder may withdraw a bid by giving the City written notice of withdrawal not later than seventy-two (72) hours after bid opening. After that date, the Bidder must receive the written consent from the Purchasing Office to withdraw the Bid. Liquidated Damages. Failure to Achieve Substantial Completion Date. If the Contractor fails to achieve Substantial Completion within the time required by this Contract, the Owner may assess liquidated damages in the amount shown in the Contract for each consecutive Calendar Day beyond Substantial Completion that Contractor fails to achieve Substantial Completion and may deduct the amount from the money due to the Contractor. Failure to Achieve Final Completion Date. If the Contractor fails to complete the Punch List by the Final Completion Date the Owner may assess liquidated damages in the amount of $50 for each consecutive Calendar Day beyond the Final Completion Date that Contractor fails to complete the Punch List and may deduct the amount from the money due to the Contractor. Force Majeure. The Owner will not assess liquidated damages for a delay caused by Force Majeure. Not a Penalty. The liquidated damages required by this Contract are not a penalty but a reasonable forecast of just compensation to the Owner for harm caused by the Contractor's delay that is difficult or impossible to determine at the time of execution of this Contract. The City reserves the right to make an award on the basis of low line item Bid, low total of line items, or in any other combination that will serve the best interest of the City and to reject any and all Bid items at the sole discretion of the City. The City also reserves the right to accept or recject all or any part of any Bid, waive minor technicalities and award the Bid to best serve the interests of the City. Any Bid may also be extended up to three (3) months at the sole discretion of the City.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
October 13, 2025
Multiple Locations, Sugar Land, TX
Related To This Project
Sugar Land, TX
Bid Date: Sep 11 2025
Sugar Land, TX
Bid Date: Sep 16 2025
Sugar Land, TX
Bid Date: Oct 03 2025
Sugar Land, TX
Bid Date: Sep 18 2025
Sugar Land, TX
--
Sugar Land, TX
Bid Date: Sep 23 2025
Sugar Land, TX
Bid Date: Sep 23 2025
Sugar Land, TX
--
Sugar Land, TX
Bid Date: Sep 11 2025
Sugar Land, TX
--
Sugar Land, TX
Bid Date: Sep 25 2025
Sugar Land, TX
--
Sugar Land, TX
Bid Date: Sep 04 2025
Sugar Land, TX
Bid Date: Sep 30 2025
Sugar Land, TX
Bid Date: Sep 04 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.