BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Site work for a water / sewer project in Garfield Heights, Ohio. Completed plans call for site work for a water / sewer project.

2025 MLK Jr Blvd Sewer Separation Each bid must contain the full names of the party or parties making the same, with an affidavit as to interested parties, and in the case of a corporation not chartered in Ohio, with a proper certificate that such corporation is authorized to do business in Ohio, and shall be accompanied by a Bid Guaranty Bond for the full amount (100%) of the Bid, in favor of the "Owner" or a certified check, cashier's check, or letter of credit pursuant to Chapter 1305 of the Ohio Revised Code, in the amount of 10% of the Bid, payable to the "Owner". The "Owner" reserves the right to reject any and all bids, to waive any informalities in the bids received, and to accept any bid which it deems most favorable. COMBINED SEWER SEPARATION PROJECT VIA NEW STORM SEWER INSTALLATION WITH CAST-IN-PLACE LINING OF THE EXISTING SANITARY. PAVEMENT, CURB, AND SIDEWALK REPLACEMENT WITHIN PROJECT LIMITS Questions about pay request processing can be directed to: Jake Bailosky at 216-865-1353 or jake.bailosky@ohm-advisors.com. OHM Advisors / Municipal Engineer / Josh Slaga, PE 6001 Euclid Avenue, Suite 130, Cleveland, OH 44103 Josh.slaga@ohm-advisors.com The Scope of Work for the MLK Jr. Blvd Sewer Separation Project consists of the following: Base Bid work includes: The current negotiated goal for construction related activities is 5.4% (the total goal is based on 3.1% of MBEs and 2.3% of WBEs participation). WBE (7% Sewer televising Sewer Cleaning and Obstruction removal CIPP sewer liner installation Sanitary Manhole Rehabilitation Storm Sewer Installation Storm Lateral Installation Roadway Reconstruction Sidewalk Installation Site Restoration

Award

Water / Sewer

$2,907,878.00

Public - City

Site Work

74

12

7

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
99
Bidding Soon
2,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2025

November 17, 2025

Project location map

Martin Luther King Jr Blvd, Garfield Heights, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.