BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work and renovation of a water / sewer project in Lancaster, Ohio. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of 9/19/2025 No bids received for this project Each bid must be accompanied by either a bid bond in an amount of 100% of the bid amount with a surety satisfactory to the Fairfield County Commissioners or by certified check, cashiers check, or letter of credit upon a solvent bank in the amount of not less than 10% of the bid amount in favor of the aforesaid Fairfield County Commissioners. The Fairfield County Commissioners reserves the right to waive any informalities or to reject any or all bids. Every request for such interpretation should be in writing addressed to: Strand Associates, Inc., Jamie Mills, jamie.mills@strand.com, phone: 614-835-0460 (ext. 5010) and to be given consideration, must be received at least five (5) days prior to the date fixed for the opening of bids Project Description: The Wastewater Treatment Plant (WWTP) Improvements for the Village of Rushville (Village) includes replacing the influent flow meter and two (2) surface aerators for the lagoons. These critical components have exceeded their design life and replacement will provide increased utility operation and maintenance. The two existing surface aerators are manufactured by Evoqua. The motors are sized at 3 horsepower, 1,800 rpm, 230/460-Volt, and 3-phase. Selected Contractor to purchase and procure replacement surface aerators for installation by Village. Replacement surface aerators should be of same size and power to existing surface aerators. Acceptable manufacturers are Evoqua Aqua-Lator Model 311-SS; or equal make and model. The existing influent flow metering system is a 4-inch magnetic flow meter, NEMA 4X transmitter, and surge protector, manufactured by ABB. The existing metering system is located within the onsite meter pit. Replacement metering equipment should include new 4-inch influent magnetic flow meter with remote NEMA 4X transmitter, surge protector, and digital recorder housed within an above grade NEMA 4X enclosure. Refer to attached site plan and flow meter specification. Contractor can mobilize any time after selection and notice to proceed occurs. Following the notice to proceed, the project should reach substantial completion within 150 days and reach final completion within 180 days. The existing meter pit bypass can be utilized for replacement of influent flow meter. Locations of two surface aerators and meter pit are shown in WWTP aerial, along with electrical notes and details.

Final Planning

Water / Sewer

$84,400.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

November 6, 2025

Project location map

Multiple Locations, Lancaster, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.