Site work and paving for a road / highway in Dothan, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of October 8,2025, project was awarded to Lewis Inc, awarded amount is $2,988,482.95.** City Street Resurfacing Project 2025 . The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Question Deadline 09/18/2025 Every request for such interpretation should be in writing addressed to Public Works Director at P.O. Box 2128, Dothan, AL 36302 and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids Scope of Work: The work shall consist of placing one or more courses of hot bituminous plant mix overlay pavement. The hot bituminous plant mix for thin overlay shall be (approximately 1 compacted thickness (average) at 110 lbs. per square yard) in reasonably close conformance with the typical cross section. The hot bituminous plant mix for thick overlay on old pavement shall be (approximately 1-1/2 compacted thickness (average) at 165 lbs. per square yard) or (approximately 2 compacted thickness (average) at 220 lbs. per square yard) in reasonably close conformance with the typical cross section. Streets that will require more than a 2 overlay shall be done in separate lifts (lift thickness decided by the City of Dothan). Additional work covered by this specification shall consist of using a herbicide to kill existing plant growth, milling of existing asphalt where needed, cleaning old pavement surface, applying tack coat and placing hot bituminous plant mix leveling course where needed. In-place density testing of new pavement is required. The work will also include restoring the street crown, machine grading existing shoulders, removing and installing speed humps, grassing (seeding), correcting structural distressed areas, and installing pipe (underdrain) as directed, as well as resetting (raise or lower) manhole covers and water and gas valve boxes to the new top of asphalt. Where existing lawns and grassed areas are disturbed during installation of underdrain or the construction of a curbed island, contractor shall re-grass these areas to original or better condition. Traffic control markings including temporary and permanent marking are also included.
Award
Roads / Highways
$2,988,483.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2025
October 23, 2025
Multiple Locations, Dothan, AL
Related To This Project
Dothan, AL
Bid Date: Sep 23 2025
Dothan, AL
Bid Date: Sep 26 2025
Dothan, AL
Bid Date: Sep 11 2025
Dothan, AL
Bid Date: Sep 19 2025
Dothan, AL
Bid Date: Sep 23 2025
Dothan, AL
Bid Date: Dec 16 2025
Dothan, AL
Bid Date: Nov 25 2025
Dothan, AL
Bid Date: Sep 23 2025
Dothan, AL
Bid Date: Sep 16 2025
Dothan, AL
Bid Date: Sep 02 2025
Dothan, AL
Bid Date: Sep 02 2025
Dothan, AL
Bid Date: Aug 26 2025
Dothan, AL
Bid Date: Aug 26 2025
Dothan, AL
Bid Date: Sep 10 2025
Dothan, AL
Bid Date: Sep 02 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.