Site work and paving for a road / highway in Dothan, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of October 8,2025, project was awarded to Lewis Inc, awarded amount is $2,988,482.95.** City Street Resurfacing Project 2025 . The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Question Deadline 09/18/2025 Every request for such interpretation should be in writing addressed to Public Works Director at P.O. Box 2128, Dothan, AL 36302 and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids Scope of Work: The work shall consist of placing one or more courses of hot bituminous plant mix overlay pavement. The hot bituminous plant mix for thin overlay shall be (approximately 1 compacted thickness (average) at 110 lbs. per square yard) in reasonably close conformance with the typical cross section. The hot bituminous plant mix for thick overlay on old pavement shall be (approximately 1-1/2 compacted thickness (average) at 165 lbs. per square yard) or (approximately 2 compacted thickness (average) at 220 lbs. per square yard) in reasonably close conformance with the typical cross section. Streets that will require more than a 2 overlay shall be done in separate lifts (lift thickness decided by the City of Dothan). Additional work covered by this specification shall consist of using a herbicide to kill existing plant growth, milling of existing asphalt where needed, cleaning old pavement surface, applying tack coat and placing hot bituminous plant mix leveling course where needed. In-place density testing of new pavement is required. The work will also include restoring the street crown, machine grading existing shoulders, removing and installing speed humps, grassing (seeding), correcting structural distressed areas, and installing pipe (underdrain) as directed, as well as resetting (raise or lower) manhole covers and water and gas valve boxes to the new top of asphalt. Where existing lawns and grassed areas are disturbed during installation of underdrain or the construction of a curbed island, contractor shall re-grass these areas to original or better condition. Traffic control markings including temporary and permanent marking are also included.

Award

Roads / Highways

$2,988,483.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
59
Bidding Soon
791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

October 23, 2025

Project location map

Multiple Locations, Dothan, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.