Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 1, 2025 at 8:00 PM
Updated September 2, 2025
This is a service / maintenance or supply contract in Magrath, Alberta. Contact the soliciting agency for additional information.
Deformation Surveys o No previous deformation surveys have been performed on Jensen Dam. Record/Topographical Surveys o As part of the last Dam Safety Review, a site topographic survey was completed in September 2024 to generate the dam crest profile and cross sections of the Jensen dam. Area of Concern - Slope Instability and Instrument Locations o Slope instabilities in the West Coulee area and along the west canal embankment are a concern for Operations. o Updated location and/or elevation data are required for all instruments. o The elevations of Fuse Plugs #2A and #2B, measured during the 2024 DSR, are significantly lower than the design elevations. Existing benchmarks and monuments o The benchmark(s) that is referenced in past reports and drawings is survey control point(s) CP1, CP2 and ASCM which are used for the topographic survey during the recent DSR. The table below is a summary of data on file for the control points. There are no existing deformation survey monuments. The existing instruments on site include: o 6 standpipe piezometers o 11 pneumatic piezometers o 2 vibrating piezometers o 4 slope indicators (needs to be confirmed in the site) Scope of work The scope of work for this project will include: o the design of the deformation monitoring network, o installation of survey monuments, o a baseline survey of the embankment and appurtenant structures, and o survey data analysis. o Review the document titled 'Standards and Specification for Deformation Surveys (1988), Alberta Environment'. - Identify outdated sections based on current standards, published guidelines, and industry best practices. - Provide detailed comments and recommendations for updating the document. - The comments will serve as input for future updates to the document. The detailed requirements of each are described in the Terms of Reference (TOR) Estimated Contract Start Date Sep 22, 2025 Estimated Contract End Date Mar 31, 2026 The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
To Be Determined, Magrath, AB
Related To This Project
Magrath, AB
Bid Date: Feb 21 2019
Magrath, AB
Bid Date: Nov 19 2024
Magrath, AB
Bid Date: Feb 18 2025
Magrath, AB
Bid Date: Sep 30 2022
Magrath, AB
Bid Date: Sep 30 2022
Magrath, AB
Bid Date: Feb 22 2022
Magrath, AB
Bid Date: Feb 22 2022
Magrath, AB
Bid Date: Aug 08 2019
Magrath, AB
Bid Date: Jun 10 2020
Magrath, AB
Bid Date: Oct 07 2020
Magrath, AB
Bid Date: Jun 25 2021
Magrath, AB
Bid Date: Jun 25 2021
Magrath, AB
Bid Date: Jul 25 2019
Lac La Biche, AB
Bid Date: Jan 16 2026
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
