BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

This is a service / maintenance or supply contract in Redlands, California. Contact the soliciting agency for additional information.

Scope of Services Any agreement resulting from the successful proposal shall be for a three (3) year period and will require the submittal of quarterly monitoring reports. Select quarterly reports will include 1) an annual summary of monitoring activities (due in April of each year); 2) results of leachate sampling (performed in October of each year, with retesting performed in April of each year; and 3) the results of annual testing of leachate containment and recovery system equipment to be performed prior to October 31 of each year (required and reported to the Santa Ana Regional Water Quality Control Board. In addition, the agreement will require electronic submittal of groundwater and leachate analytical data into a database each quarter as required by the State Water Resources Control Board. All supporting witnessing, supervision, analyses, documentation and liaison as needed, and described herein will be provided. Monitoring Support: Consultant will collect the required samples from the designated sampling locations and submit samples to the City-selected, State certified laboratory for analysis. Leachate samples will be collected and delivered to the laboratory by staff or consultant. Online Q&A Yes Q&A Deadline 09/03/2025 2:00 PM (PDT) Published response to questions Monday, September 8, 2025 2:00 pm Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% for a three-year period beginning with the first quarter 2026 monitoring event. The City, at its sole discretion, reserves the right to accept or reject any or all proposals received as a result of this RFP, to negotiate with any qualified source, or to cancel this RFP in part or its entirety, and to waive minor irregularities in any proposal. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
1
Bidding Soon
1,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.