Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Site work for a water / sewer project in Brecknrdg Hls, Missouri. Completed plans call for site work for a water / sewer project.

The work to be done under this contract consists of the construction of approximately 474 lineal feet of 8-inch diameter sanitary sewer, of which 421 lineal feet shall be installed by pipe bursting methods, and appurtenances to be constructed. Location Located south of Interstate 70 and east of Interstate 170, in unincorporated St. Louis County, Missouri. Contact the Project Engineer, Daniel Lindley, at 314-335-2055, Regarding Technical Questions. Please Contact Stacey Hunter in the Purchasing Department at 314-436-8738 for Bidding Information on This Project. If You Have Questions or Recommendations Concerning the District's Mwbe Program, Please Contact Shonnah Paredes, Manager of Diversity Programs, at (314)768-6395 or by Email at Sparedesastlmsd.com. Question Deadline 09/25/2025 Questions received less than 5 days prior to the date of bid opening. MBE (10%), WBE (10%) Note NO PREBID A. Bids will be received only from companies that are prequalified by the District's Engineering Department for TunnelinglTrenchless or Deep Sewer Construction. B. The Bid Proposal shall be prepared on a Proposal Form, provided by the District, in accordance with Section 2.3, FORM OF PROPOSAL of the General Project Specifications. Bids not submitted on District provided forms will be rejected. The proposal shall be accompanied by a certified check or cashier's check on a bank or trust company in St. Louis County or in the City of St. Louis or by a bidder's bond, for an amount not less than five (5%) percent of the bid amount as bid security to the District. C. The work to be done under this contract consists of the construction of approximately 474 lineal feet of 8-inch diameter sanitary sewer, of which 421 lineal feet shall be installed by pipe bursting methods, and appurtenances to be constructed in an area located south of Interstate 70 and east of Interstate 170, in unincorporated St. Louis County, Missouri. D. If, within twenty-four (24) hours after bids are opened, any bidder files a duly signed, written notice with the Executive Director along with supporting documents that demonstrates to the reasonable satisfaction of the District that there was a material and substantial mistake (other than judgment) in the preparation of its bid. The work to be done under this contract consists of the construction of approximately 474 lineal feet of 8-inch diameter sanitary sewer, of which 421 lineal feet shall be installed by pipe bursting methods, and appurtenances to be constructed in an area located south of Interstate 70 and east of Interstate 170, in unincorporated St. Louis County, Missouri. The Engineers Opinion of Probable Cost for this project is $300,000. The Metropolitan St. Louis Sewer District (District) has established subcontractor goals for Building Construction (21% MBE and 10% WBE) and Non-Building Construction (10% MBE and 10% WBE) in the amount of $50,000 or more. Workforce goal requirements of 37% Minority, 11% Women, and 46% Apprentice (when applicable) apply to contracts in the amount of $500,000 or more. The requirements are further explained in the attached Business Diversity Utilization and Workforce Program document.

Award

Water / Sewer

$245,836.00

Public - City

Site Work

4

6

7

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
7
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

October 30, 2025

Project location map

Lyndhurst Ave, Brecknrdg Hls, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.