BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work for a water / sewer project in Los Angeles, California. Completed plans call for site work for a water / sewer project.

**As of November 26, 2025 , this project has not yet been awarded. The project is expected to be awarded on January 2026.** The work consists of rehabilitation of approximately 20,400 linear feet of prestressed concrete cylinder pipe (PCCP) including excavating access portals and removing portions of existing PCCP for pipeline access, furnishing and installing steel liner cylinders and valves, expanding and welding the steel pipe cylinders, grouting the annular space and applying cement mortar lining, installing Metropolitan-furnished equipment, enlarging manhole access, relocating air valves, rehabilitating a service connection, modifying pipeline appurtenant facilities, disinfecting affected pipeline, restoring site, controlling traffic, abating hazardous materials, and other appurtenant work as specified and shown on the drawings. Q&A Deadline 10/08/2025 2:00 PM (PDT) Questions regarding this project shall be emailed to SpecsDesk@mwdh2o.com. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% For this project, Metropolitan requires small and/or disabled veteran business participation of at least 20 percent of the total bid. Failure to meet this percentage will cause Metropolitan to reject the bid as non-responsive. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimate Value - 75,000,000 - 95,000,000

Bid Results

Water / Sewer

$61,242,000.00

Public - State/Provincial

Site Work

358

29

17

9

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

January 5, 2026

Project location map

Multiple Locations, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.