Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2025 at 8:00 PM
Updated September 25, 2025
This is a service / maintenance or supply contract in Woods Cross, Utah. Contact the soliciting agency for additional information.
The Woods Cross City Hall and Hogan Park Complex will be constructed at 1555 South 800 West in Woods Cross, Utah. The new facility is anticipated to be a 25,000 to 35,000 square foot, multi-story building to house the Administration, Community Development, Court, Finance, and Police departments and function as an emergency operations center. The first floor is projected to contain City Council chambers, community gathering rooms, meeting rooms, and a covered exterior gathering space (approximately 2,000 to 3,000 square while offices and support functions will be located on 2nd floor and basement levels. In addition to the city hall building, revisions to Hogan Park are anticipated, which may include restrooms, a pavilion, playing fields, pickleball and basketball courts, playground equipment, and other park amenities. An amphitheater and water feature for a passive use park may also be considered. Site development includes parking, curb and gutter, sidewalks, landscaping, stormwater drainage, subsurface utilities, community gathering spaces, and a potential water feature. Geotechnical challenges due to subsidence in the area will need to be evaluated and considered in all phases of design and construction. The City will contract for a geotechnical analysis of the site. These reports will be made available for geotechnical analysis of the site. These reports will be made available ffor use in preparing, and providing the City, as part of the project design and construction. The City will retain a separate contractor (CM/GC) to construct the project. The selected CM/GC firm will provide collaborative preconstruction services, cost estimating, constructability input, scheduling, and ultimately serve as the general contractor for construction. Questions: Question regarding the project will be taken up to September 18 at 5:00 pm. Submit all questions in writing to: Curtis Poole Community Development Director Email: cpoole@woodscross.gov. Woods Cross City is soliciting proposals from a qualified architect and structural design firm to provide professional services for the design and architectural construction oversite of the new Woods Cross City Hall and Hogan Park Complex, to be located at 1555 South 800 West, Woods Cross, Utah. The project will be delivered in two phases under the CM/ delivery method: Phase 1 - Design and Preconstruction, and Phase 2 - Construction. This RFP outlines the required qualifications, proposal content, and evaluation criteria to assist the City in selecting a firm that demonstrates experience, innovation, and capability to deliver a high-quality civic facility that meets community needs. The project includes the demolition of select existing facilities, buildings and structures, site preparation, utility coordination, and the construction of a new city hall building, associated public amenities, and park improvements. The Architect will work collaboratively with the City and CM/GC throughout the design, budgeting, value engineering, scheduling, and construction phases to ensure the successful delivery of a high-quality, cost-effective, and community-oriented facility. 4.1 Phase 1: Design The selected Architect will collaborate with the City and CM/GC on the following: o Needs assessment, programming, planning, and preliminary design o Preliminary architectural, structural, mechanical, electrical, and plumbing design and engineering o Interior and exterior finishes o Site improvements including utility coordination o Integration of City's existing key card and CCTV security systems o AV, data, telecom, intrusion detection systems o Revised Hogan Park layout and amenities o Planning Commission/City Council presentations o Exhibits, renderings, materials boards as needed o Engineering estimates o Delivery of a Guaranteed Maximum Price (GMP), which shall include all fees and percentages required by this RFP. 4.2 Phase 2: Construction The Construction Phase will begin after a GMP has been accepted by the City. The selected Architect will collaborate with the City and CM/GC on the following: o Geotechnical investigations o Surveying and utility location o Utility relocation coordination o Topographic and site assessments o Full construction ready documents including but not limited to the following: o Site improvements o Interior and exterior finishes o Architectural, structural, mechanical, electrical, and plumbing design o Engineering estimates o Compliance with local, state, and federal codes relating to building, environmental, worksite safety, etc. o Coordination with City and CM/GC o Weekly site visits and inspections o Prepare, review and approve submittals, RFIs,and pay applications o Support for contractor coordination and oversight The City reserves the right to reject any and all proposals or waive minor irregularities. The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2026
1555 S 800 W, Woods Cross, UT
Related To This Project
Woods Cross, UT
Bid Date: Sep 30 2025
Woods Cross, UT
Bid Date: Oct 23 2025
Woods Cross, UT
Bid Date: Jan 14 2026
Woods Cross, UT
Bid Date: Sep 11 2025
Woods Cross, UT
Bid Date: Sep 25 2025
Woods Cross, UT
Bid Date: Jun 26 2025
Woods Cross, UT
Bid Date: May 20 2025
Woods Cross, UT
Bid Date: May 29 2025
Woods Cross, UT
Bid Date: May 14 2025
Woods Cross, UT
Bid Date: Apr 01 2025
Woods Cross, UT
Bid Date: Jan 16 2025
Woods Cross, UT
Bid Date: Dec 16 2024
Woods Cross, UT
Bid Date: Sep 03 2024
Woods Cross, UT
Bid Date: Aug 05 2024
Woods Cross, UT
Bid Date: Jun 21 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
