Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 15, 2025 at 8:00 PM
Updated October 16, 2025
Renovation of a detention facility in Akron, Ohio. Completed plans call for the renovation of a detention facility.
Cliff Skeen Community Based Correctional Facility for Women Roofing Replacement Project. The existing roof to be replaced are past their useful service life and replacing them will extend the life of this County owned building. Location-941 Sherman St. Akron, OH 44311 The County reserves the right to reject all bids. Anticipated Award Date: 09/25/2025 Estimated Cost - $450,000.00 Re-Roof Scope: Adhered EPDM System - Overlay of Existing EPDM System - Steel Deck - Examine Existing Roofing System, Remove & Replace Any Wet or Damaged Materials. - Grid Cut (10x10) Existing Membrane - Elevate ISOGard HD Coverboard Fastened - Elevate 060 LSFR EPDM Adhered - Elevate ES-1 Coping Metal - Elevate 20-YR Red Shield Warranty with additional coverage: o Damage due to winds up to 72-mph o 32-Hour Cut & Puncture Coverage Installation of Adhered EPDM System o Examine Existing Roofing System, Remove & Replace Any Wet or Damaged Materials. o Grid Cut Existing Membrane Maximum 10x10. Remove all flashings & edge metal. o Examine the existing system and site conditions to ensure they are ready to receive work. o Install Elevate 1/2 " IsoGard HD coverboard to be mechanically fastened per manufacturer requirements. o Remove and replace any damaged existing wood nailers. (LF Unit Pricing) o Install an additional Wood Nailer to match the height of new insulation. o Adhere RubberGard 60-mil LSFR EPDM with 3" factory laminated QuickSeam Tape utilizing standard bonding adhesive or Jet Bond adhesive. o Complete all flashings, terminations, drains and metal work per Elevate 20-year specifications and details. o Lift all curbed exhaust fans and install flashings onto top of curb where possible. Where not feasible to lift unit install "slip" flashings to counterflash the terminations. Contractor to coordinate any required curb electrical work with building owner. o Install UNA-Edge Coping per Elevate details to match existing coping coverage. o Install Coping per details ensuring EPDM membrane is extended up and over the wall. o Install QuickSeam Walkway Pads from roof access points to all roof levels in which roof traffic will be present to match the existing walkways. Match Existing. o If applicable, contractor to coordinate with lightning protection contractor to remove and re-install lightning protection per state and federal requirements to gain recertification. o Elevate final inspection to be conducted upon completion of the project by filing the RFI within the PIN System. Contractor to be responsible for workmanship for 2-years.
Award
Jails / Prisons
$328,578.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2025
October 17, 2025
941 Sherman St, Akron, OH
Related To This Project
Akron, OH
--
Akron, OH
Bid Date: Oct 09 2025
Akron, OH
--
Akron, OH
Bid Date: Sep 25 2025
Akron, OH
Bid Date: Oct 07 2025
Akron, OH
Bid Date: Oct 01 2025
Akron, OH
Bid Date: Sep 12 2025
Akron, OH
Bid Date: Jan 15 2026
Akron, OH
Bid Date: Aug 25 2025
Akron, OH
Bid Date: Sep 22 2025
Akron, OH
Bid Date: Sep 04 2025
Akron, OH
Bid Date: Aug 27 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
