BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2025 at 7:00 PM

Updated November 18, 2025

Site work, paving and outdoor lighting for a mixed-use development in Roswell, Georgia. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

Construction of an 8' to 10'-wide multi-use trail on Woodstock Road from SR 92 to Crabapple Middle School. Work shall include concrete, sidewalk, curb & gutter, erosion control, traffic control, grading, lighting, etc. All questions or requests for clarification must be sent via Bonfire and are due by Monday September 15th, 2025, at 5:00 p.m. EST. Questions received after this date and time may not be answered. Questions and clarifications will be answered in the form of an addendum. Any addenda, schedule changes, and other important information regarding the solicitation related to this solicitation will be posted on the online. The City of Roswell reserves the right to reject all bids and to waive technicalities and informalities, and to make an award in the best interest of the City of Roswell. The Successful Bidder may also be required to furnish a Maintenance Bond, in the amount of one-third (1/3) of the contract price, guaranteeing the repair or replacement caused by defective workmanship or materials for a period of one (1) year from the completion of construction. Scope of Services Construction of an 8' to 10'-wide multi-use trail on Woodstock Road from SR 92 to Crabapple Middle School. Work shall include concrete, sidewalk, curb & gutter, erosion control, traffic control, grading, lighting, etc. 1. The Contractor must be prequalified or registered with the Georgia Department of Transportation (GDOT). Submit evidence of prequalification with the bid. 2. The quantities shown on the plans are approximate quantities. This project will be paid per the actual material quantities used in the field as dictated by the field conditions unless specific lump sum pricing is requested in the Price Bid form (and any attached Schedules to the Price Bid form). Monthly invoices to be submitted at end of the month for completed work during the previous month. It is the contractor's responsibility to include all necessary expenses for the complete construction of this project in the schedule, or to point out where it is impossible to do so in the question-and-answer period.

Award

Roads / Highways

$3,192,339.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
166
Bidding Soon
2,290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

October 27, 2025

Project location map

Woodstock Rd, Roswell, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.