Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 30, 2025 at 8:00 PM
Updated October 31, 2025
Renovation of a water / sewer project in Naples, Florida. Completed plans call for the renovation of a water / sewer project.
The “Questions and Answers” period has been changed from October 17, 2025, at 5:00 pm EST to October 27, 2025, at 5:00 pm EST. construction of South County Water Reclamation Facility Preliminary Treatment Screen Replacement. Question Submission Deadline:October 17, 2025, 5:00pm The anticipated project budget is: $3,214,000.00. General description of the Work at the South County Water Reclamation Facility (SCWRF) required under this Contract. Awarded Contractor must replace existing screens with only MultiRake Bar Screens RakeMax-CF and replacement of compactor/washer units only with Wash and Press (WAPs), both manufactured by Huber Technologies. In addition, replacement of four (4) motor operated channel gates and (2) manual channel gates that fully satisfy current fit, form and function. The removal and reinstallation of manual bar screen. The isolation and bypassing of flows for project work. Miscellaneous piping and piping modifications; cleaning, repair and coating of concrete channels. Replacement of existing decking and miscellaneous electrical work. A. The Work in this Contract consists of: 1. All locate work including underground and above ground piping and conduit and embedded conduits. 2. Demolition of existing Influent Screens and compactor/washer units including anchor bolts removal and patching in the channels. 3. Installation of temporary gates, stainless steel plates, and bulkheads as required to assist in equipment and channel isolation. 4. Installation of new screen system, including wash press and sluice, drop chutes, anchor bolts, supports, piping, etc. 5. Repair and coating the channels with a waterproofing membrane or coating (By Others). 6. Removal of existing gates including chipping out and removing any abandoned existing gate rails 7. Installation of new gates, gate rails, actuators, level sensors, aluminum decking, electrical control panels, conduit, etc. 8. Temporary measures as required, including temporary stairs, handrails, bypass pumps and piping with supports. 9. Aluminum deck removal including aluminum beams and installation of new aluminum deck system and new aluminum beams. 10. Removal and replacement of existing electrical and I/C equipment. 11. All equipment and system startups, testing as described in the Contract Documents. 12. All operation and maintenance manuals as described in the Contract Documents. 13. Project record documents as described in the Contract Documents. 14. All Work with scheduling and coordination requirements as noted in the Contract Documents. 15. Complete final cleaning and restoration. The Contractor shall refer to the entire Contract Documents for a more complete description of the Work. B. The Contractor shall organize, coordinate, schedule and execute the various phases or sites of the Contract Work so as to be in strict compliance with the following: 1. Special Project Requirements and Sequence of Work as noted on Contract Drawings Sheet G-3 and G-4. 2. The requirements for written shut-down plans as per Contract Drawings. C. The Contract Work includes handling and disposal of residual liquid, grit and solids in the existing tanks and equipment systems. The Work also includes temporary measures as may be required to shut-off or control the flows affecting execution of the Work. Before proceeding with such temporary measures, the Contractor shall submit written details for approval. Refer to Section 01140 for additional information and requirements. D. The Contractor shall provide factory certified start-up of the new screens and appurtenances. E. Execution of the Work will require coordination and planning with the SCWRF Manager, the County's Project Manager and Engineer. The Work shall be presented in a manner and schedule that does not interfere with the on-going normal operations of the SCWRF. F. The SCWRF will have other construction projects ongoing. As a result, the Contractor shall coordinate his work with these other projects. This coordination shall include submitting weekly schedules and cooperating with other contractors. G. Contractor staff shall use the gate at 5600 Warren Street for access/egress. Large truck deliveries will be made through the rear door of the SCWRF. This is subject to change. The Contractor shall coordinate and regulate all site access/egress with the SCWRF Manager and the County Project Manager. H. Construct the Work under a single contract. Certain materials as described in the Contract Documents may be furnished by the Owner for unloading, storing, installation, start-up and testing assistance by the Contractor. The Contractor shall provide coordination and technical support associated with Owner furnished material.
Post-Bid
Water / Sewer
$3,214,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2025
December 30, 2025
5600 Warren St, Naples, FL
Related To This Project
Naples, FL
Bid Date: Sep 19 2025
Naples, FL
Bid Date: Sep 11 2025
Naples, FL
Bid Date: Sep 16 2025
Naples, FL
Bid Date: Sep 29 2025
Naples, FL
Bid Date: Oct 24 2025
Naples, FL
Bid Date: Oct 13 2025
Naples, FL
Bid Date: Oct 16 2025
Naples, FL
Bid Date: Nov 19 2025
Naples, FL
Bid Date: Sep 17 2025
Naples, FL
Bid Date: Mar 29 2019
Naples, FL
Bid Date: Oct 27 2020
Naples, FL
Bid Date: Jul 02 2020
Naples, FL
Bid Date: Oct 24 2025
Naples, FL
Bid Date: Oct 23 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
