BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Tyler, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Smith County reserves the right to accept or reject in whole or in part any Proposal received and to waive any irregularities or formalities in the best interest of Smith County.Minority Business Enterprises,Small Business Enterprises and Women Business Enterprises are encouraged to submit proposals. All questions pertaining to this bid shall be addressed in writing to the Purchasing Director, Jaye Latch, at purchasing@smith-county.com. Smith County requests one (1) original copy and one (1) USB flashdrive of your bid. Pavement improvements for this project shall consist of the following work items and/or categories. This description may not include all the work items that are required for this project, whether the items are paid or subsidiary to pertinent items. A. BRIDGE REPLACEMENT FOR CR 1139 @ INDIAN CREEK: 1. Set up barricades and close roadway. 2. Set up erosion control devices. 3. Confirm underground utility locations. 4. Prep ROW shall consist of cleaning the edges ofthe roadway as well as tree & brush clearing and disposal. 5. The bridge replacement will consist of a single-span, box beam bridge. 6. The bridge foundation will be concrete drilled shafts with concrete caps. 7. Approach slopes and header banks will be armored with stone riprap. 8. Place embankment consisting of(Type C) material for the permanent approach roadway. 9. Cement treat finished subgrade. 10. Final paving surface will be dense graded type D hot mix asphalt with edges backfilled using suitable embankment material. 11. Install metal beam guard fence 12. Place pavement marking and permanent signing. 13. Open road to traffic. 14. Establish permanent erosion control. 15. Remove traffic & temp erosion control devices. Access by property owners shall be maintained throughout this project. Closure of the roadway for critical work items shall be allowed but limited as much as possible. Contractor shall notify affected property owners prior to such closures. Final cleanup of all work areas shall be made prior to final acceptance ofthe project, Prospective Bidders are expected to inspect the site of work and to inform themselves regarding all local conditions.

Award

Bridges / Tunnels

$842,454.00

Public - County

Demolition, New Construction, Paving, Site Work

5

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
75
Bidding Soon
986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

November 4, 2025

Project location map

County Rd 1139, Tyler, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.