Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
Site work and paving for a road / highway in Bashaw, Alberta. Design plans call for site work for a road / highway; and for paving for a road / highway.
Highway 53:08 -3 Km West of Highway 822 to Highway 21 (WAC0087151). Work includes crack repair, asphalt concrete pavement, minor geometric improvements and other work. TIMELINE: Planning and design work to commence shortly. Construction is tentatively scheduled for 2027. Tender and construction timing may be confirmed mid-/late 2026.
Design
Roads / Highways
$4,336,161.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2027
AB-53, Bashaw, AB
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
