BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Renovation of a water / sewer project in Belton, Missouri. Completed plans call for the renovation of a water / sewer project.

Procure and install clarifier mechanism for Clarifier #2 at the Belton Wastewater Treatment Plant. Question Deadline 09/23/2025 All questions regarding the bidding of this project must be submitted to Robert Orr, Engineer I, City of Belton, by phone at (816) 892-1293 or by email at borr@belton.org. All questions must be received (3) days prior to the bid opening. The Public Works Department reserves the right to reject any or all bids not deemed acceptable. Requests for information related to this RFP should be directed to: Robert Orr, Engineer I Telephone: (816) 892-1293 E-Mail: borr@belton.org The City intends to select a general Contractor to procure and install the clarifier mechanism for Clarifier 2 (Figure 1) at the Belton Wastewater Treatment Plant (WWTP). The City of Belton is seeking proposals that has a renewable option for one additional clarifier upon completion of this project if agreeable by both the City and the Contractor. The clarifier mechanism and all appurtenant equipment shall be suitable for installation in the existing 70-foot diameter clarifiers at the Belton Wastewater Treatment Plant as indicated in Appendix A, Scope of Work. Incorporated in Project Special Provisions is a circular clarifier mechanism installation specification that was developed to meet the City's design preferences including controls, materials of construction, and keeping the same suction header type as is currently installed. The specification was reviewed by all acceptable manufacturers listed in Appendix A, Part 2.01.

Bid Results

Water / Sewer

$530,800.00

Public - City

Renovation

6

6

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
113
Bidding Soon
1,206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2025

October 27, 2025

Project location map

21200 S Mullen Rd, Belton, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.