Published September 13, 2025 at 8:00 PM
Updated September 14, 2025
Renovation of a military facility in San Francisco, California. Completed plans call for the renovation of a military facility.
The contractor shall replace 500 square feet of flooring on the first floor and 1,500 square feet on the second floor of the main station building at USCG Station San Francisco with new commercial-grade, hard-wearing, waterproof luxury vinyl planks (LVP). The contractor is responsible for providing all labor, materials, and equipment necessary for the installation. Tasks include mobilization, removal of existing flooring, substrate preparation, installation of LVP flooring, trim and finish work, disposal of waste materials, and demobilization. The flooring color will be selected by the technical point of contact. Work must be performed between 7:00 AM and 5:00 PM, Monday through Friday, excluding federal holidays, unless otherwise authorized. The contractor must maintain cleanliness throughout the project and restore all areas to their original condition upon completion. All waste must be disposed of in accordance with industry standards and environmental regulations. The government will provide electricity, parking, and laydown area, but bathroom facilities will not be available for contractor personnel. As required by FAR 36.204, the estimated magnitude of this project is between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Offers submitted must be valid for a minimum of 30 calendar days. Offerors interested in a site visit prior to solicitation closing must notify the contracting officer and contract specialist immediately to facilitate access to the worksite. Attendance at a site visit is not mandatory and will not influence the outcome of this procurement. The intent of this Statement of Work (SOW) is to have the contractor replace 500 square feet of flooring on the first floor and 1500 square feet of flooring on the second floor with new commercial grade, hard-wearing, waterproof luxury vinyl planks (LVP) in the main station building at USCG Station San Francisco, located on Yerba Buena Island, San Francisco, CA. The contractor will provide all labor, materials, and equipment required to complete the installation. The color of the flooring will be chosen by the customer. a. Carefully remove the existing flooring on 500 square feet of the first floor and 1500 square feet of the second floor, ensuring all debris is properly managed and contained.
Post-Bid
Military
$100,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2025
October 13, 2025
1 Yerba Buena Rd, San Francisco, CA
Related To This Project
San Francisco, CA
Bid Date: Sep 18 2025
San Francisco, CA
Bid Date: Sep 10 2025
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 30 2025
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Oct 03 2025
San Francisco, CA
Bid Date: Sep 26 2025
San Francisco, CA
Bid Date: Sep 26 2025
San Francisco, CA
Bid Date: Sep 15 2025
San Francisco, CA
Bid Date: Sep 12 2025
San Francisco, CA
Bid Date: Oct 01 2025
San Francisco, CA
Bid Date: Sep 26 2025
San Francisco, CA
Bid Date: Nov 26 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.