Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 8, 2026 at 7:00 PM
Updated January 9, 2026
Site work and paving for a mixed-use development in Cathedral City, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The scope of work consists of furnishing all supervision and labor, materials, necessary equipment and tools, utility work, traffic control and public services coordination required for the completion of the Project. The proposed improvements include clearing and grubbing, cold milling of existing asphalt pavement, construction of Portland cement concrete pavement, construction of asphalt pavement, reconstruction of curb ramps, construction of raised crosswalks, installation of flashing beacons, including Rectangular Rapid Flashing Beacons (RRFB), installation of LED lighting, including poles, foundations, pull boxes, and conduit, installation of pavement striping and markings, traffic signage, and installation of fencing and pavers. All work and resulting facilities will fully conform to the currently adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process. This project is to be completed within 100 working days from the date specified in the Notice to Proceed. There is no pre-bid conference scheduled for this project. Bid security in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance. he successful bidder will be required to furnish a Labor and Materials bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. The City reserves the right to reject any or all bids, and to waive any irregularities in the bids. The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of sixty (60) days.
Post-Bid
Roads / Highways
$1,057,925.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 7, 2026
March 9, 2026
Multiple Locations, Cathedral City, CA
Related To This Project
Cathedral City, CA
Bid Date: Oct 07 2025
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
Bid Date: Nov 11 2025
Cathedral City, CA
Bid Date: Nov 12 2025
Cathedral City, CA
Bid Date: Dec 09 2025
Cathedral City, CA
Bid Date: Dec 16 2025
Cathedral City, CA
Bid Date: Sep 04 2025
Cathedral City, CA
Bid Date: Sep 09 2025
Cathedral City, CA
Bid Date: Aug 28 2025
Cathedral City, CA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
