Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work and paving for a civil project in Madeline, California. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and water / sewer project.
REQUISITION/PURCHASE REQUEST NO. HFLCEO250323PR The project involves rehabilitating Blue Lake Road (CR 258), CR 64, and Campground Road within the Warner Mountain Ranger District of the Modoc National Forest to improve safety and access to recreational facilities at Blue Lake. Work includes addressing rockfall and slope failure hazards at two locations on CR 64, located 4.6 miles and 8 miles east of Likely, California. Rehabilitation of CR 258 spans 6.6 miles from the intersection with CR 64 near the Pit River bridge to Campground Road, followed by 1.5 miles southwest to the campground loop at Blue Lake. Scope of work includes pulverizing and asphalt surfacing, reconstruction of short segments, rockfall hazard mitigation, and drainage improvements. Roadway widths will be maintained at 20 and 22 on CR 258 and CR 64, and preserved on Campground Road. All work will remain within the existing road prism and maintained roadside ditch, except where guardrail and culvert replacements are necessary. Additional tasks include minor horizontal and profile adjustments, subexcavation, ditch reconditioning, erosion control, signage installation, and pavement markings. The price range of the project work is between $10,000,000 and $20,000,000. Question Deadline 10/16/2025 at 4:00 PM PT Questions can be submitted to CFLcontracts@dot.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - HFLCEO250323PR
Post-Bid
Roads / Highways
$20,000,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
December 22, 2025
Blue Lake Rd, Madeline, CA
Related To This Project
Madeline, CA
--
Madeline, CA
Bid Date: May 30 2024
Grover Beach, CA
--
Irvine, CA
Bid Date: Sep 18 2025
Davis Creek, CA
Bid Date: Oct 07 2025
Oakland, CA
Bid Date: Sep 12 2025
Twentynine Palms, CA
Bid Date: Oct 16 2025
Santa Cruz, CA
Bid Date: Oct 02 2025
Fort Bragg, CA
Bid Date: Sep 12 2025
Pasadena, CA
Bid Date: Oct 06 2025
Beaumont, CA
Bid Date: Sep 23 2025
Merced, CA
Bid Date: Sep 30 2025
Palm Desert, CA
Bid Date: Oct 09 2025
San Diego, CA
Bid Date: Oct 03 2025
Lemon Grove, CA
Bid Date: Sep 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
