Published September 17, 2025 at 8:00 PM
Updated September 18, 2025
Renovation of a laboratory facility in Beltsville, Maryland. Completed plans call for the renovation of a laboratory facility.
The Contractor shall furnish all equipment, materials, and labor required to perform three mechanical services. For backflow preventers, the Contractor shall supply and install two 8" Zurn/Wilkins or equivalent units, one 4" unit, and one 1.5" unit. For main gate valves, the Contractor shall supply and install two 8" valves on the effluent side of the backflow preventers, and replace two 8" flanged ductile 90's, one 8" tee, and seven bolt and gasket kits. This work must be completed during off hours. For chiller pipe replacement, the Contractor shall remove and replace up to 8 feet of leaking 10-inch schedule 40 welded pipe in the ceiling of the chiller room, which requires disconnecting the chemical feed line. Two new thread-o-lets shall be installed, with one plugged off and the other connected to the new chemical line. The schedule 80 PVC shall be replaced back to the ball valve using new split rings. Leak checks must be performed and monitored by building engineers for 24 hours prior to insulation. New insulation and wrapping shall be installed and tied into existing piping. Plastic vinyl 90's may be reused if undamaged. A smoke eater must be used during all welding, grinding, cutting, and torching, and necessary fire safety equipment must be provided. Building engineers must be informed when fire or sparks will occur. Extend the question period deadline to Thursday, 09/11/2025 at 12:00pm Please complete attached police check inquiry posted in SAM.gov solicitation. All police check inquiry must be completed and submitted to Government POC by 12:00PM on Wednesday 09/10/2025 The Contractor shall furnish all equipment, materials, and labor required to perform the following 3mechanical services: 1. Backflow Preventors o Supply and install 2 each 8" Zurn/Wilkins or equivalent BFP o Supply and install 1 each 4" Zurn/Wilkins or equivalent BFP o Supply and install 1 each 1.5" Zurn/Wilkins or equivalent BFP 2. Main Gate Valves o Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits. o NOTE-This work will need to be completed during off hours. 3. Chiller Pipe Replacement o Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room. o Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line. o Install 2 new thread-o-lets, plug one off and connect the new chemical line. o Replace the schedule 80 PVC all the way back to the ball valve with new split rings. o Leak checked to be performed and monitored by building engineers for 24 hours before insulating o Install new insulation and wrapping over new pipe and tie into existing. o The plastic vinyl 90's may be reused if not damaged during removal Line Period of Performance: 09/15/2025 - 09/14/2026 ATF POC: Brandon Hodnett/Brandon.Hodnett@ATF.gov
Post-Bid
Laboratories
$400,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2025
September 17, 2025
6000 Ammendale Rd, Beltsville, MD
Related To This Project
Beltsville, MD
Bid Date: Nov 10 2025
Beltsville, MD
Bid Date: Sep 08 2025
Beltsville, MD
Bid Date: Aug 20 2025
Beltsville, MD
Bid Date: Aug 08 2025
Beltsville, MD
Bid Date: Aug 25 2025
Beltsville, MD
Bid Date: Aug 29 2025
Beltsville, MD
Bid Date: Jul 01 2025
Beltsville, MD
Bid Date: Apr 25 2025
Beltsville, MD
--
Beltsville, MD
Bid Date: Dec 05 2024
Beltsville, MD
Bid Date: Aug 30 2024
Beltsville, MD
Bid Date: Aug 27 2024
Beltsville, MD
Bid Date: Aug 26 2024
Beltsville, MD
Bid Date: Sep 16 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.