Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 15, 2025 at 8:00 PM
Updated October 16, 2025
Site work for a civil project in Columbus, Nebraska. Completed plans call for site work for a water / sewer project.
The Nebraska Public Power District (DISTRICT) intends to procure all necessary labor, supervision, materials, tools, apparatus, equipment, conveyances, mobilization, and demobilization to replace irrigation taps No. 4 and No. 13 including removal of an abandoned tap west of Tap No. 13 located on the Kearney Canal, which begins approximately one and one-half (1-1/2) miles east of Elm Creek, Nebraska, and ends in Kearney, Nebraska, and all other requirements as specified in these Contract Documents. Following the pre-bid meeting all prospective Bidders will then visit both sites. The purpose of the site visits will be to answer any questions or clarifications the Bidder may have concerning the Contract specifications and to familiarize the Bidder with the project site layout. It is imperative that all prospective Bidders attend this meeting. Bids will not be accepted from any Bidder not in attendance at the pre-bid meeting. Should the Bidder have questions concerning the documents, they shall direct their questions to Greg Trofholz, Procurement Specialist, at (402) 563-5357, or by e-mail at gatrofh@nppd.com The CONTRACTOR shall provide all necessary labor, supervision, materials, tools, apparatus, equipment, conveyances, mobilization, and demobilization to replace irrigation Tap No. 4 and Tap No. 13, including removal of an abandoned tap west of Tap No. 13, located on the Kearney Canal which begins approximately one and one-half (1-1/2) miles east of Elm Creek, NE, and ends in Kearney, NE, and all other requirements as specified in these Contract Documents. Tap No. 4 is located approximately 0.40 miles east of Evergreen Road and 0.60 miles west of Dove Hill Avenue. Coordinates of Tap No. 4 are 40.69977_N and 99.19029_W. Tap No. 13 is located approximately 200 feet west of 30th Avenue. Coordinates of Tap No. 13 are 40.70086_N and 99.12295_W. The bid submitted for Tap No. 13 shall include the removal of the abandoned tap in accordance with the scope of work included herein. The abandoned tap is located approximately 90 feet west of Tap 13. Coordinates of the abandoned tap are 40.70080_N and 99.12326_W.
Award
Water / Sewer
$4,000,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
December 1, 2025
To Be Determined, Columbus, NE
Related To This Project
Columbus, NE
Bid Date: Nov 03 2025
Columbus, NE
Bid Date: Oct 07 2025
Columbus, NE
Bid Date: Oct 02 2025
Columbus, NE
Bid Date: Oct 14 2025
Columbus, NE
Bid Date: Nov 12 2025
Columbus, NE
Bid Date: Nov 12 2025
Columbus, NE
Bid Date: Oct 28 2025
Columbus, NE
Bid Date: Nov 04 2025
Columbus, NE
Bid Date: Sep 18 2025
Columbus, NE
Bid Date: Sep 09 2025
Columbus, NE
Bid Date: Aug 19 2025
Columbus, NE
Bid Date: Sep 16 2025
Columbus, NE
Bid Date: Aug 29 2025
Columbus, NE
Bid Date: Aug 13 2025
Columbus, NE
Bid Date: Jul 30 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
