Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 28, 2025
Site work and new construction of a power facility in Sturgis, Michigan. Completed plans call for the construction of a power facility; and for site work for a power facility.
This Construction Contract covers a general contract to construct a new substation at a greenfield site (233 Bogen Rd, Sturgis, MI 49091) for the City of Sturgis. The project description and summary below are intended to provide the Construction Contractor with the overall scope of work and required schedule, but note that not every detail of the work required is listed. The Contractor is required to review the construction drawings, specifications, and site conditions prior to bidding, and to fully complete the construction project if awarded. Question Deadline 10/20/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Attn: Nick Abraitis Email nabraitis@verdantas.com Questions received less than seven days prior to the date for opening of Bids may not be answered. Reference Number 0000397775 The overall scope of this project consists of the construction of a new 69kV:12.5kV dual transformer electrical distribution substation. Construction will consist of all site preparation, installation of two (2) 69kV circuit switchers, two (2) 10/12.5MVA power transformers, three (3) 69kV breakers, six (6) 15kV breakers, six (5) 69kV PT's for relaying & metering, one(1) 15kV main & transfer bus structure, all equipment foundations, conduit, fence and ground grid, plus a new control house, control panels, battery system, and all associated protective relaying as more fully depicted on the drawings and in the specifications. Transmission & Distribution wood pole top assemblies, wooden pole riser construction (including conduit and cable installation), plus site restoration and transmission line removals are included in this contract. You are invited to bid on a general construction contract. The Contract provides for the furnishing of all labor, equipment, and materials necessary to construct the Sturgis Substation Project. A Milestone date of June 1, 2026 for completion. General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 10 % Bid security in the form of a Bid Bond in the amount of not less than 10 percent of the total Bid Price must accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to reject any or all bids and to waive irregularities therein, and all bidders must agree that such rejection shall be without liability on the part of the Buyer for any damage or claim brought by any bidder because of such rejections, nor shall the bidders seek any recourse of any kind against the Owner or Engineer because of such rejections. The filing of any bid in response to this invitation shall constitute an agreement of the bidder to these conditions.
Post-Bid
Power Plant
$400,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 27, 2025
November 26, 2025
233 Bogen Rd, Sturgis, MI
Related To This Project
Sturgis, MI
Bid Date: Sep 15 2025
Sturgis, MI
Bid Date: Sep 15 2025
Sturgis, MI
Bid Date: Sep 26 2025
Sturgis, MI
Bid Date: Sep 15 2025
Sturgis, MI
Bid Date: Sep 03 2025
Sturgis, MI
Bid Date: Sep 03 2025
Sturgis, MI
Bid Date: Sep 15 2025
Sturgis, MI
Bid Date: Sep 22 2025
Sturgis, MI
Bid Date: Aug 11 2025
Sturgis, MI
Bid Date: Aug 18 2025
Sturgis, MI
Bid Date: Jun 30 2025
Sturgis, MI
Bid Date: Jul 21 2025
Sturgis, MI
Bid Date: Jul 14 2025
Sturgis, MI
Bid Date: Jun 13 2025
Sturgis, MI
Bid Date: Jul 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
